Laserfiche WebLink
TABLE NO. 1-A BUILDING PERMIT FEES <br /> <br />1. Inspections outside of normal business hours ............................. $45.00 per hour <br /> (minimum charge-two hours) <br /> <br />2. Reinspection fees assessed under provisions <br /> $45.00 <br /> of Section 108.8 ........................................................................... <br /> <br />3. Inspections for which no fees is specifically <br /> indicated ....................................................................................... $45.00 per hour <br /> (minimum charge-one-half hour) <br /> <br />4. Additional plan review required by changes, <br /> additions or revisions to approved plans ...................................... $45.00 per hour <br /> (minimum charge-one-half hour) <br />5. Microfilming charge (all building permits) ..................................... 5% of base fee <br />6. Energy conservation fee (where applicable) ................................ 6% of base fee <br />7. Noise insulation fee (where applicable) ........................................ 8% of base fee <br /> <br /> 8. Code compliance inspection $100.00 <br /> Detached single family dwelling ................................................... $100 plus $20 per unit <br /> Multi-family dwelling ..................................................................... <br /> <br /> 9. Building Moving Permits (R.C. Ord. Sec. 9.22-9.39) <br /> Application fee .............................................................................. $150.00 <br /> Inspection fee <br /> Building located in Redwood City .............................................. $100.00 <br /> Building located outside Redwood City ..................................... $100.00 plus travel <br /> expenses and $30.00 <br /> per hour of travel time <br /> <br /> 10. Combination Fee (Electrical, Plumbing, & Mechanical Permit Fee) <br /> All new restaurant and medical buildings ..................................... 130% of base fee <br /> All other new buildings ................................................................. 80% of base fee <br /> All additions and interior alterations ............................................. 25% of base fee <br /> <br /> 11. Strong Motion Instrumentation Fees ............................................ As required by State of <br /> California <br /> <br /> 12. For use of outside consultants for plan checking and <br /> inspections, or both ...................................................................... Actual costs* <br /> <br /> 13. Plan review fee ................................................................................. 70% of Table 1-A <br /> Building Permit Fee <br /> <br /> 14. Minimum Building permit fee ........................................................... $40.00 <br /> 15. Minimum Plumbing, Mechanical, Electrical permit fee .....................$30.00 <br /> <br /> * Actual costs include administrative and overhead costs. <br /> <br /> EXHIBITS-1 <br /> <br /> <br />