Laserfiche WebLink
TABLE 1-B MECHANICAL PERMIT FEES (Continued) <br /> <br /> For the installation or relocation of each boiler or compressor over <br /> 30 horsepower (105.5 kW) to and including 50 horsepower <br /> (176 kW), or for each absorption system over 100,000 Btu/h <br /> (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW) ......... 50.00 <br /> For the installation or relocation of each boiler or compressor over <br /> 50 horsepower (176 kW), or for each absorption system over <br /> 83.00 <br /> 1,750,000 Btu/h (512.9 kW) ...................................................... <br /> <br />5. Air Handlers <br /> For each air-handling unit to and including 10,000 cubic feet per <br /> minute (4,720 L/s), including ducts attached thereto ................ 10.00 <br /> Note: This fee does not apply to an air-handling unit which is a <br /> portion of a factory-assembled appliance, cooling unit, evaporative <br /> cooler or absorption unit for which a permit is required elsewhere in <br /> the Mechanical Code <br /> For each air-handling unit exceeding 10,000 cfm (4,720 L/s) ....... 16.00 <br /> <br />6. Evaporative Coolers <br /> For each evaporative cooler other than portable type ................... 10.00 <br /> <br />7. Ventilation and Exhaust <br /> For each ventilation fan connected to a single duct ...................... 7.00 <br /> For each ventilation system which is not a portion of heating or air- <br /> conditioning system authorized by a permit .............................. 10.00 <br /> For the installation of each hood which is served by mechanical <br /> exhaust, including the ducts for such hood ............................... 10.00 <br /> <br /> 8. Incinerator <br /> For the installation or relocation of each domestic-type incinerator <br /> For the installation or relocation of each commemial or industrial- <br /> type incinerator ......................................................................... 67.00 <br /> <br /> 9, Miscellaneous <br /> For each appliance or piece or equipment regulated by the <br /> Mechanical Code but not classed in other appliance categories, <br /> or for which no other fee is listed in the code ............................ 10.00 <br /> When Appendix B, Chapter 13, is applicable (see Section 103), <br /> permit fees for fuel-gas piping shall be as follows: <br /> For each gas-piping system of one to four outlets ................ 5.00 <br /> For each gas-piping system additional outlets over five <br /> each .................................................................................. 1.00 <br /> <br /> EXHIBITS-8 <br /> <br /> <br />