My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-05-06 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-05-06 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:58:50 PM
Creation date
5/2/2019 3:54:27 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/6/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
612
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />•[• <br />,,y .. <br />Fy Gats°5t§' ....��a <br />101 <br />Redwood <br />11 (/ X \. V\ \ \A/' <br />Implementation of the illustrative "Moderate \ <br />Growth" 2040 Service Scenario would require <br />the construction of several 4 -track stations <br />throughout the corridor including the <br />construction of a 4 -track station in <br />Redwood City. <br />Implementation of the illustrative "High Growth" <br />2040 Service Scenario would require up to 15 <br />miles of new 4 -track segments along the Caltrain <br />corridor including a potential 4 -track segment <br />running from Hayward Park in San Mateo south <br />to a 4 -track station in Redwood City. <br />Concepts shown are illustrative only and any <br />decision to advance planning for potential <br />4 -track stations or overtakes in San Mateo would <br />be based on direction by the Caltrain Board and <br />would involve significant subsequent feasibility <br />analysis, community engagement, and <br />environmental clearance as well as coordination <br />with any Dumbarton rail related improvements <br />and grade separation studies. C <br />Downtown <br />1/2 <br />Legend Current Projects Potential Projects <br />Caltrain line Station enhancements <br />lO Switching Station (Electrification) 0 and platform extensions G G <br />Key Destination© Whipple Grade Separation Study 0 Possible Location for G✓ G✓ <br />(includes Brewster, Broadway, Maple, Main, and Chestnut) Conceptual 4 -track p <br />© Dumbarton Corridor Station <br />0 Broadway Streetcar <br />© Downtown Transit Center Study far <br />40 Electrification <br />
The URL can be used to link to this page
Your browser does not support the video tag.