My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-05-06 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-05-06 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:58:50 PM
Creation date
5/2/2019 3:54:27 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/6/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
612
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.A. - Page 36 of 6$f, <br />Aareement for rueFoint Services Exhibit D — Water Budget Methodology <br />EXHIBIT D: <br />Water Budget Methodology <br />The following defines the Water Budget Methodology Implementation and Operational Requirements to <br />be implemented for calculating water budgets for landscape irrigation and residential water utility <br />accounts in Redwood City. Because the methodology is subject to change due to changes in water <br />supply, drought, regulation, or City policy, TruePoint will train City staff so that they are able to <br />configure and modify water budgets with minimal intervention from TruePoint. The term "Customer" in <br />this Exhibit is meant to reference a Redwood City utility customer. <br />Background: <br />Redwood City water budgets are based on the Landscape Coefficient Method that is the standard of the <br />Green industry, It is endorsed by the Irrigation Association, California Landscape Contractors <br />Association, California Water Efficiency Partnership, and over 300 water agencies as the hest <br />methodology for identifying and maximizing landscape irrigation efficiency. Water Budgets are <br />calculated daily for the previous day utilizing weather data retrieved from external web services. At the <br />end of a consumption period water budgets calculated for each day in the consumption period are <br />added to provide a sum total water budget far use by the billing system. <br />Water Budeet Definitions & Variables: <br />Variable <br />Definition <br />Default Values <br />Variable <br />given period. The overall water use budget for a site is the <br />sum of budgets over all hydrozones. In some cases, during <br />Type <br />BUDGET= <br />Volume of water budgeted for a given hydrozone area for a <br />Formula <br />given period. The overall water use budget for a site is the <br />sum of budgets over all hydrozones. In some cases, during <br />winter months with low ETo and high rainfall it is possible for <br />the aggregate water budget to be equal to 0. The aggregate <br />water budget for any consumption period at the time of <br />billing shall not be less than 2 hcf. The water budget for any <br />one day in the consumption period shall not be less than 0 <br />hcf. <br />AREA <br />Landscape area irrigated in a hydrozone (square feet). <br />AT or ANT or Aw <br />AT <br />Turfgrass area in square feet. (If a site-specific variable has <br />Res.= 100 Site Variable <br />not been entered the default value shall be applied for the <br />Non -Res. _ <br />site. Default values differ for residential and non-residential <br />1000 <br />water use types.) <br />ANT <br />Non -Turf area in square feet. (If a site-specific variable has <br />Res.= 250 Site Variable <br />not been entered the default value shall be applied for the <br />Non -Res. = 0 <br />site. Default values differ for residential and non-residential <br />water use types.) <br />Aw <br />Water Feature area in square feet. (If a site-specific variable <br />0 Site Variable <br />has not been entered the default value shall be applied for <br />the site.) <br />REV: 04-23-19 PR <br />Page 32 of 64 <br />Water Budget Methodology Page - 32 - <br />ATTYlAGR.2019.106lTruePoint TrueBill Utility Billing System <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.