My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-05-20 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-05-20 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:47:20 PM
Creation date
5/16/2019 5:27:10 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
5/16/2019 5:32 PM
Modified:
5/16/2019 5:32 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXVTRIMFE
ID:
2
Creator:
Created:
5/16/2019 5:32 PM
Modified:
5/16/2019 5:32 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXVTRIMFE
ID:
3
Creator:
Created:
5/16/2019 5:32 PM
Modified:
5/16/2019 5:32 PM
Text:
http://www.redwoodcity.org/home/showdocument?id=2002
ID:
4
Creator:
Created:
5/16/2019 5:32 PM
Modified:
5/16/2019 5:32 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH38WASYRE
ID:
5
Creator:
Created:
5/16/2019 5:32 PM
Modified:
5/16/2019 5:32 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXVIPAIMFE
ID:
6
Creator:
Created:
5/16/2019 5:32 PM
Modified:
5/16/2019 5:32 PM
Text:
http://www.seq.org/+uploaded/file_1677.pdf
ID:
7
Creator:
Created:
5/16/2019 5:32 PM
Modified:
5/16/2019 5:32 PM
Text:
http://www.seq.org/+uploaded/file_1677.pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
682
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 51 of 141 <br />Mitigation Measures - Provide written documentation of compliance with all required <br />mitigation measures in the Mitigation Monitoring and Reporting Program (MMRP) established <br />by the certified Environmental Impact Report prior to issuance of final certificate of occupancy. <br />[COA] [PLANNING] <br />Fees <br />The following fees must be paid in full prior to issuance of the building permit unless otherwise <br />described below. <br />6. Transportation Impact Fee - Pay a Traffic Impact Fee for the net new trips resulting from the <br />proposed project, estimated at $758,373. These fees must be paid in full prior to the issuance <br />of each respective building permit. [SDR] [ENGINEERING] <br />Transportation Fair Share Contribution- Pay the project's fair share contribution for the US <br />101/Woodside Road Interchange Improvement Project, estimated at $3,062,050, a mitigation <br />for the project further described in the Environmental Impact Report prior to issuance of the <br />first building permit. [SDR] [ENGINEERING] <br />8. Water and Sewer Fees - Pay applicable water, recycled water, and wastewater -related fees as <br />outlined on the City's website. These fees must be paid in full prior to the issuance of each <br />respective building permit. [SDR] [ENGINEERING] <br />9. Parks Impact Fee - Pay a Parks Impact Fee for the net new dwelling units resulting from the <br />proposed project, estimated at $4,653,776.97 prior to final map approval. [SDR] [PARKS] <br />10. Emergency Water Storage Fair Share Contribution - Pay a fair share towards the <br />emergency potable water storage needs of the City as mitigation for the project described in <br />the Environmental Impact Report prior to issuance of a Temporary or Final Certificate of <br />Occupancy (whichever is issued first) of any office building. [MMRP] [ENGINEERING] <br />11. School Impact Fee - For residential additions greater than 500 square feet and new <br />commercial or industrial construction, pay a School Impact Fee to the Sequoia Union High <br />School District. Information regarding this fee may be obtained by contacting the Sequoia Union <br />High School District at (650) 369-1411. [SDR] [SCHOOL DISTRICT] <br />12. Notice of Fees Protest - The applicant may protest any fees, dedications, reservations, or other <br />exactions imposed by the City as part of the approval or as a condition of approval of this <br />development. Per California Government Code Section 66020, this 90 -day protest period has <br />begun as of the date of the approval of this application. [SDR] [OFFICE OF THE CITY ATTORNEY] <br />Landscaping and Site Improvements <br />13. Water -Efficient Landscaping - Provide a landscaping and irrigation plan conforming to the <br />California Water -Efficient Landscape Ordinance (AB 1881), including an automatic irrigation <br />system (drip, micro -spray, or bubblers) with a rain sensor, and show these measures on the <br />building permit plans. [COA] [PLANNING] <br />14. Tree Survey - Provide a tree survey that identifies type, diameter at breast height (DBH), <br />condition and location prior to building permit issuance. [COA] [PLANNING] <br />ATTY/RESO.0051 CC RESO APPROVING PROJECT— BROADWAY PLAZA <br />REV: 05-15-19 PR <br />Page 9 of 22 <br />415 <br />
The URL can be used to link to this page
Your browser does not support the video tag.