Laserfiche WebLink
VICl'K Rge 69 of 141 <br />The project is a mixed-use development consisting of residential, office, and commercial/retail uses on two sites, Broadway Site and Bay Road <br />Site. Development of the Broadway Site would consist of demolishing the existing commercial/retail buildings and constructing 120 affordable <br />residential units, 400 market -rate residential units, 420,000 5F of office space, 11,000 5F of commercial/retail, and 10,000 SF of childcare <br />facilities. <br />The affordable residential units would be in a standalone building and the market -rate residential consists of two buildings with the commercial/ <br />retail and childcare located on the ground level. The affordable residential would be 5 -stories and the market -rate residential would be <br />6 -stories tall. Both have a courtyard amenity for residents on top of the parking podium, 17 ft above sidewalk level. The office consists of three <br />buildings and are separated from the residential by a 1.6 -acre public open Space. The office height would vary between 4-5 stories. Under <br />Article 53.7.8.3 of the Redwood City Zoning Code, the maximum height in the MUC-GB zoning i5 6 stories/85 feet if the project provides a <br />public benefit, such as ground floor retail or public open space. <br />Residential parking would be in a two-level parking structure, with one level above grade Screened by buildings and residential stoop units, <br />and a second level subterranean garage. The garage would be connected on the second subterranean level to the adjacent underground office <br />parking garage to allowshared parking between these complementary uses. <br />On a 1.9 -acre portion of the Bay Road Site, a new surface parked 15,000 5F standalone CVS Pharmacy would be constructed on the northeast <br />corner of Bay Road and Woodside Road, A retail use is allowed under the current Light Industrial Incubator Overlay (LI -10) zoning with a <br />conditional use permit and would not require a General Plan Amendment (GPA) or a Zoning Amendment. <br />The project will also include site remediation activities to address soil and groundwater contamination on the Broadway site. A cleanup <br />program is in place and is overseen by the Regional Water Quality Control Board, District 2. <br />PROJECT TEAM <br />CLIENT <br />The Sobrato Organization <br />Peter Tsai, Vice President <br />Real Estate Development <br />10500 N. De Anza Blvd., Suite 200 <br />Cupertino, CA 95014 <br />(408) 446-0700 <br />ptsai@sobrato.com <br />CLIENT (AFFORDABLE RESIDENTIAL) <br />MidPen Housing Corporation <br />Matt Lewis, Project Manager <br />303 Vintage Park Dr., Suite 250 <br />Faster City, CA 94404 <br />(650) 356-2900 <br />www.midpen-housing.org <br />CIVIL ENGINEER <br />LANDSCAPE ARCHITECT <br />Kier & Wright <br />RAISER PERh7AN ENTE <br />ME DICAL CENTER <br />1' <br />Paul Lettieri, ASLA, Principal <br />3350 Scott Blvd., #22 <br />- i <br />Santa Clara, CA 95054 <br />BROADWAY �l <br />(408)727-6665 <br />r r `e <br />r <br />www.kierwright.corn <br />www.tgp-inc.com <br />- <br />67 <br />562 <br />56% <br />KANN Ea "STANFORD IN <br />t <br />Broadway Site <br />Bay Site L <br />R[uLYoDo cnT' CAMPLX <br />_ <br />`...1• <br />` ,.__�.._�..� <br />J <br />"BATf[I7.�r <br />__ <br />:ill . <br />�'-', <br />12 <br />1,071 <br />10% <br />12,852 <br />2.0 <br />24 <br />ParkingTotaIRequired <br />OF FICO <br />629 <br />100% <br />75,394 <br />6 <br />132 <br />Pronerty M a nag eme at r' Amenity <br />99 <br />8G <br />124 <br />6,700 <br />0 <br />4 <br />Affordable Pkg Req ulred Tata! <br />82,094 <br />HOOVER <br />7 S <br />Rf570EHTlAL <br />1,AA K <br />PROJECT INFORMATION <br />BROADWAY SITE <br />BAY ROAD SITE <br />Site Address: <br />Proposed Mix of Uses: <br />Parking: <br />Site Address: <br />1401 Broadway, Redwood City, CA <br />400 apartment units <br />subterranean garage <br />2201 Bay Road, Redwood City, CA <br />Current Use: Commercial Retail <br />120 affordable units <br />Open Space: <br />Current Use: Commercial <br />Zoning: Mixed -Use Corridor Toning District <br />420,000 sf office space <br />mid -block public access <br />Zoning: Light Industrial <br />Site Area: 11.2 acres <br />10,000 sf retail <br />park and corner plaza <br />Incubator District <br />(excl. Denny's and Jack-in-the-Box) <br />11,000 sf childcare <br />Site Area: 4.1 acres <br />Proposed Intensity: <br />Proposed: 15,000 sf retail (CVS) <br />47 du/ac and 0.86 FAR <br />Building Height: up to 30 -ft <br />Building Height: <br />Parking: Parking Lot <br />up to 85 -ft <br />PROJECT DESCRIPTION <br />The project is a mixed-use development consisting of residential, office, and commercial/retail uses on two sites, Broadway Site and Bay Road <br />Site. Development of the Broadway Site would consist of demolishing the existing commercial/retail buildings and constructing 120 affordable <br />residential units, 400 market -rate residential units, 420,000 5F of office space, 11,000 5F of commercial/retail, and 10,000 SF of childcare <br />facilities. <br />The affordable residential units would be in a standalone building and the market -rate residential consists of two buildings with the commercial/ <br />retail and childcare located on the ground level. The affordable residential would be 5 -stories and the market -rate residential would be <br />6 -stories tall. Both have a courtyard amenity for residents on top of the parking podium, 17 ft above sidewalk level. The office consists of three <br />buildings and are separated from the residential by a 1.6 -acre public open Space. The office height would vary between 4-5 stories. Under <br />Article 53.7.8.3 of the Redwood City Zoning Code, the maximum height in the MUC-GB zoning i5 6 stories/85 feet if the project provides a <br />public benefit, such as ground floor retail or public open space. <br />Residential parking would be in a two-level parking structure, with one level above grade Screened by buildings and residential stoop units, <br />and a second level subterranean garage. The garage would be connected on the second subterranean level to the adjacent underground office <br />parking garage to allowshared parking between these complementary uses. <br />On a 1.9 -acre portion of the Bay Road Site, a new surface parked 15,000 5F standalone CVS Pharmacy would be constructed on the northeast <br />corner of Bay Road and Woodside Road, A retail use is allowed under the current Light Industrial Incubator Overlay (LI -10) zoning with a <br />conditional use permit and would not require a General Plan Amendment (GPA) or a Zoning Amendment. <br />The project will also include site remediation activities to address soil and groundwater contamination on the Broadway site. A cleanup <br />program is in place and is overseen by the Regional Water Quality Control Board, District 2. <br />PROJECT TEAM <br />CLIENT <br />The Sobrato Organization <br />Peter Tsai, Vice President <br />Real Estate Development <br />10500 N. De Anza Blvd., Suite 200 <br />Cupertino, CA 95014 <br />(408) 446-0700 <br />ptsai@sobrato.com <br />CLIENT (AFFORDABLE RESIDENTIAL) <br />MidPen Housing Corporation <br />Matt Lewis, Project Manager <br />303 Vintage Park Dr., Suite 250 <br />Faster City, CA 94404 <br />(650) 356-2900 <br />www.midpen-housing.org <br />CIVIL ENGINEER <br />LANDSCAPE ARCHITECT <br />Kier & Wright <br />The Guzzardo Partnership, Inc <br />Mark A. Knudsen, P.E. QSD, Principal <br />Paul Lettieri, ASLA, Principal <br />3350 Scott Blvd., #22 <br />181 Greenwich Street <br />Santa Clara, CA 95054 <br />San Francisco CA 94111 <br />(408)727-6665 <br />(415)433-4572 <br />www.kierwright.corn <br />www.tgp-inc.com <br />ARCHITECT (RESIDENTIAL) <br />Studio T -SCI., Inc <br />Chek F. Tang AIA, NCARB, Principal <br />30412th Street, Suite 2A <br />Oakland, CA 94607 <br />(510)451-2850 <br />www.studiot-sq.com <br />ARCHITECT (OFFICE) <br />Farm 4 Architecture <br />John Marx AIA, Design Principal <br />126 Post Street 3rd floor <br />San Francisca, CA 94108 <br />(415)215-6601 <br />www.form4inc.com <br />PARKING CONSULTANT <br />Watry Design, Inc. <br />David N. LoCcco <br />2099 Gateway PI, #550 <br />San Jose, CA 95110 <br />(408) 392-7900 <br />www.watrydesign.com <br />OVERALL SITE CALCULATION: <br />BROADWAY SITE <br />(West of Woodside Rd) <br />Market Rate Residential <br />Affordable Residential <br />Office <br />Public Open Space <br />BROADWAY SITE <br />11.2 ac 487,872 sf AFFORDARLE RESIDE N NAL (aW LOING 31 <br />3.7 ac 161,172 sf <br />1.1 ac 47,916 sf <br />4.8 ac 209,088 sf <br />1.6 ac 69,696 sf <br />BAY ROAD SITE 4.1 ac <br />)East of Woodside Rd) <br />CVS 1.9 ac <br />Undeveloped Land 2.2 ac <br />(NOTE: Nota part of proposed project) <br />179,03 sf <br />82,764 sf <br />97,139 sf <br />UNITS {AFFORDABLE] <br />Quantity <br />sf <br />Unit MILK <br />Rentable sf <br />Pkg Ratio <br />Pkg Stalls Required <br />Studio Units <br />17 <br />384 <br />14% <br />6,528 <br />l.0 <br />17 <br />1 -bedroom units <br />67 <br />562 <br />56% <br />37,654 <br />1.0 <br />67 <br />2-bedroorn units <br />24 <br />765 <br />20% <br />18,360 <br />1.D <br />24 <br />3 -bedroom units <br />12 <br />1,071 <br />10% <br />12,852 <br />2.0 <br />24 <br />ParkingTotaIRequired <br />120 <br />629 <br />100% <br />75,394 <br />Motorcycle Parking (S% of provided vehicle parking) <br />132 <br />Pronerty M a nag eme at r' Amenity <br />99 <br />8G <br />124 <br />6,700 <br />0 <br />4 <br />Affordable Pkg Req ulred Tata! <br />82,094 <br />236 <br />PARKING PROVIDED for Affordable Residentlal <br />EVStails <br />ADA Pkg <br />Tandem <br />Standard PkgStallsirrovided <br />Parking on -grade it II <br />Park-ngin suoterranean garage (611' <br />2 <br />3 <br />3 <br />2 <br />G <br />30 <br />13t S: <br />49 84 <br />Parking Total Provided <br />S <br />5 <br />36 <br />90 136 <br />Biryc le Parking (class 1) (1 bike 13 un its 49 <br />Motorcvc'0 Parking(5%of provided vehicle park;ng) B <br />BROADWAY SITE GROSS AREA MARKET RATE REST DE NTIAl. (BUILDINGS I&21 <br />AFFORDABLE RESIDENTIAL (BUILDING 34 <br />GROSSAREA <br />x <br />m <br />Level 1/Street Level <br />15,220 <br />Level 2 <br />23,660 <br />Level <br />23,860 <br />Level <br />23,860 <br />Level <br />21,741 <br />TOTAL <br />108 541 <br />MARKET -RATE RESIDENTIAL (BUILDING IL & 2) <br />GROSS AREA <br />c <br />" n <br />v'T <br />aE <br />5 6� <br />j 5 <br />M <br />Level 1/Street Level 42,001 <br />Level 2 46,223 <br />Level 46,157 <br />Level 46,157 <br />Level 46,157 <br />Level 41,770 <br />TOTAL 268,465 <br />27,500 <br />BLDG C-Of9ce <br />to <br />FS <br />0° <br />Level I/Street Level 18,009 <br />Level 38,478 <br />Level 37,956 <br />Level 37,956 <br />Level 37,956 <br />Level 34,827 <br />TOTAL 705,18T <br />125 <br />BUILDING 1 & 2 473,547 <br />OFFICE GROSS AREA and F.A.R. [BULIDING A, B &Q <br />GR055 AREA <br />V <br />t <br />TOTAL Building A 110,000 <br />TOTAL Building B 110,000 <br />TOTAL Building C 200,000 <br />Tota( Office 420,008 <br />F.A.R. 0.86 <br />LOTCOVERAGE <br />GROSS AREA <br />F <br />g z <br />A ti <br />m O <br />1L <br />Affordable Residential <br />37,720 <br />Market Rate Resid entia l <br />139,155 <br />BLDG A - Office <br />27,500 <br />BLDG B - Office <br />27,500 <br />BLDG C-Of9ce <br />40,000 <br />TOTAL <br />771,8711 <br />LOTCOVERAGE <br />SB% <br />COMBINED PARKING STRATEGY <br />4D0 stalls 274 stalls 1 1;035 stalls <br />I I <br />674 snIL% <br />Residential Pkg <br />MRrket-Rate 1,309 stalls <br />Dfffce Pkg <br />BAY ROAD LOT COVERAGE <br />GROSS AREA <br />N a <br />7 <br />U r`z' <br />Total sf - retail 15,000 <br />Unit MSX <br />F.A.R. / Lot Coverage 8.16 <br />AL d.1--, <br />UNITS MAR%ET RATE} <br />quantity <br />A <br />Unit MSX <br />Rentable sf <br />Pkg Ratio Fkg Stalls Required <br />Studio Units <br />20 <br />625 <br />5% <br />12,500 <br />1 5 30 <br />1 -broom units <br />255 <br />726 <br />64% <br />185,134 <br />1.5 3133 <br />2 -bedroom units <br />125 <br />1,152 <br />31% <br />144,000 <br />2-0 259 <br />Parking Total Required <br />400 <br />854 <br />100% <br />341,630 <br />663 <br />Proaerty M a nag erne nt 7 Ame nity <br />68 <br />21 <br />1,220 <br />12,900 <br />0 <br />Market Rate Pkg Required Total <br />354,530 <br />663 <br />PARKING PROVIDED for Market Rate Residential EV Stalls <br />ADA Pkg <br />Tandem <br />Standard Pkg Stalls Provided <br />Parking on-grade(L1) 9 <br />Parking lnsubterran can garage (61)* 11 <br />a <br />1 <br />46 <br />42 <br />66 125 <br />205 275 <br />Dedicated Market Rate Residential Parking 2:1 <br />Shared 5ubterra neap Parking 9 <br />110,000 <br />28 <br />0 <br />2.71 40D <br />274 274 <br />Parka TotalPrwAdcd 20 <br />71 <br />99 <br />271 674 <br />Bicycle Parking (class 1) (5% of provided vehide parking) 134 <br />Metorcycie Parking (5%of provided vehicle parking) 76 <br />RETAIL AND CHILOCARE <br />USE <br />Rfl Oars sf per floor Total sf Pkg Ratio Pkg Stalls Requ;red <br />Retail <br />Childcare <br />i 11,0(10 11,000 5.0/1.0001 SS <br />] 10,000 10,000 3-311,000 <br />Parking Tata I Required <br />89 <br />PARKING PROVIDED for Retail and Chi ldrare EV Stasis ADA Pkg Tandem Standard Pkg Stalls Provided <br />Park;ngon-grade L11 6 5 0 77 ER <br />Perking T4ta1 ProNded 6 S D 77 89 <br />Bicycle Parking {class 1] (5% of Provided'vehlde parking) 1 <br />Motorcyde parking (5%of provided vehicle parking) <br />UDMMFRCIAI r1FA[7F?MJII u1NGS A. a. ri <br />OAR F.A.R <br />OFFICE <br />R f loons <br />sf per floor <br />Total sf <br />Pkg Ratio <br />Pkg Stalls Bequired <br />Building A <br />•7 <br />37.500 <br />110,000 <br />Parking in subterranean garage (62) <br />34 <br />Building <br />a <br />27,500 <br />1101000 <br />fib <br />20 <br />Ruilding C <br />1,02.1 <br />4q❑t7❑ <br />?W.000 <br />0 <br />274 <br />Parking Tota l Requ] red7Proposed <br />Surface Parking at Office Auto Court <br />0 <br />428,11x1 <br />3.111,DSW <br />11369 <br />PARKING PROVIDED for Office <br />EV Stalls <br />ADA Pkg <br />Standard <br />Pkg Stalls Provided <br />Parking m subterraneangarage (Bl) <br />34 <br />20 <br />451 <br />7011 <br />Parking in subterranean garage (62) <br />34 <br />0 <br />485 <br />511� <br />Subterranean Of ke F'Rrking ]oral Provided <br />fib <br />20 <br />936 <br />1,02.1 <br />Shared Subterranean Parking <br />0 <br />0 <br />274 <br />27� <br />Surface Parking at Office Auto Court <br />0 <br />1 <br />10 <br />11 <br />Park( Teta( Provided <br />68 <br />21 <br />1,220 <br />I,3D.9 <br />Bicycle Parking {class 1} (5% of provided vehicle parking <br />Surface Easement Parkin Behind De nay's <br />G <br />66 <br />Motorcycle Parking (S% of provided vehicle parking) <br />an <br />Total Project Parking Prayided <br />99 <br />8G <br />PARK NG ALLOCATION <br />PARKING ALLOCATION <br />Pk Stalls PmVlded <br />Dedicated Affordable Residential Parkin Structure <br />136 <br />Dedicated Market Rate Residential Parka Structure <br />1300 <br />Ded;cated Retail/Childcare Parkin Structure <br />88 <br />Dedicated Offi ce Parking (Structure) <br />1,024 <br />Shared Parkin Structure) <br />�7a <br />Surface Parkin at Of[ice Auto Court <br />] 1 <br />Surface Easement Parking 6ehlnd Denny's <br />29 <br />Total Parking Provided <br />1,953 <br />TnTA1 Cn M RIN Fn PARKING <br />TOTAL PARKING PROVIDED <br />EV Scalls <br />AD0. Pk <br />Tandem <br />standard P <br />Stalis Provided <br />Parking on -grad e( L LJ <br />17 <br />12 <br />52 <br />1.84 <br />265 <br />Parking in subterra n can garage (131) <br />48 <br />39 <br />72 <br />979 <br />1,138 <br />Parkin insubterranean arae 62 <br />34 <br />0 <br />0 <br />485 <br />519 <br />Total Structure Parking <br />99 <br />51 <br />174 <br />1,648 <br />I1932 <br />Surface Office parking <br />0 <br />1 <br />❑ <br />10 <br />11 <br />Surface Easement Parkin Behind De nay's <br />n <br />G <br />❑ <br />20 <br />an <br />Total Project Parking Prayided <br />99 <br />52 <br />124 <br />3,678 <br />1,953 <br />Paralle17 <br />Prking Stall on Bay Road (not part of project) <br />7 S <br />BAY ROAD SITE (CVS) <br />BAY ROAD 51 r ICS.;) <br />CIIS Ratio EV <br />ADA <br />Standard <br />Total <br />Total sf {CVS) <br />15,000 <br />Parkin Provided 5.711,000 E. <br />a <br />75 <br />HS <br />Bicycle Parking {class 111 (5% or provided vehicle parking) <br />a <br />MetarlVde Parking (5% of provided vehicle parkin ) <br />;1 <br />'.0 0A W 0, 111. Sit 901 <br />STUDIO <br />T SQUARE <br />Architecture <br />Planning <br />Urban Design <br />+�a ooc,.Aa- carr.,ws .raravrw <br />F,cJw nal. *a vnwn-sa FIC Iw �snrv/w[a <br />w cormdkc ra, x Lwraorulsos ar <br />rnuw .w a, rcrcw ora ouci.wr al ns <br />eare+-s ww w-ee vFm r11R wit o+IAP <br />nw.vec �wP�.API�rt�nc9 so o�v <br />W c <br />N � <br />C7 <br />N O r <br />Ct3 Uj <br />0 <br />-0 C <br />� e � <br />iy <br />m r <br />Sheet TIBe: <br />PROJECT SUMMARY <br />Job NO. 14023 <br />Date: 0 311 51201 9 <br />Scale: N-T.S. <br />Drawn By: <br />shF-:,t No: <br />G 0.0 <br />A77 <br />rsr� <br />