Laserfiche WebLink
05/20/2019 <br />Impact HH -7: Implementation of the Project would not impair implementation of, <br />or physically interfere with, an adopted emergency response plan or emergency <br />evacuation plan. <br />Impact HH -8: Implementation of the project would not expose people or <br />structures to a significant risk of loss, injury, or death involving wildland fires, <br />including where wildlands are adjacent to urbanized areas or where residences are <br />intermixed with wildlands. <br />Impact HH -9: The Project, in combination with past, present, and reasonably <br />foreseeable projects, would result in less -than -significant cumulative impacts with <br />respect to hazards and hazardous materials. <br />9. Hydrology and Water Quality. These findings regarding the Project's potential impacts <br />relating to hydrology and water quality are based on the analyses on pages 4.8-14 to 4.8-25 of <br />the DEIR, which are hereby incorporated herein in its entirety. <br />Impact HW -1: Implementation of the Project would not violate any water quality <br />standards or waste discharge requirements. <br />Impact HW -2: Implementation of the Project would not substantially deplete <br />groundwater supplies or interfere substantially with groundwater recharge such that <br />there would be a net deficit in aquifer volume or a lowering of the local groundwater <br />table (e.g., the production rate of pre-existing nearby wells would drop to a level <br />which would not support existing land uses or planned uses for which permits have <br />been granted). <br />Impact HW -3: Implementation of the Project would not substantially alter the <br />existing drainage pattern of the site or area, including through the alteration of the <br />course of a stream or river, or substantially increase the rate or amount of surface <br />runoff in a manner which would result in substantial erosion or siltation on-site or <br />off-site. <br />Impact HW -4: Implementation of the Project would not substantially alter the <br />existing drainage pattern of the site or area, including through the alteration of the <br />course of a stream or river, or substantially increase the rate or amount of surface <br />runoff in a manner which would result in substantial flooding on-site or off-site. <br />Impact HW -5: Implementation of the Project would not create or contribute runoff <br />water which would exceed the capacity of existing or planned stormwater drainage <br />systems or provide substantial additional sources of polluted runoff. <br />Impact HW -6: Implementation of the Project would not otherwise substantially <br />degrade water quality. <br />Impact HW -7: Implementation of the Project would not place housing within a <br />100 -year flood hazard area as mapped on a federal hazard boundary or Flood <br />Insurance Rate Map or other flood hazard delineation map. <br />Impact HW -8: Implementation of the Project would not place structures within a <br />100 -year flood hazard area which would impede or redirect flood flows. <br />ATTY/RESO.0052 CC RESO CEQA BROADWAY PLAZA—SOBRATO RESO. NO. 15768 <br />REV: 05-15-19 PR MUFF NO. 601 <br />Page 12 of 30 <br />