My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-06-10 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-06-10 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:15:24 AM
Creation date
6/6/2019 4:04:36 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/10/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
739
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.0. - Page 136 of 179 <br />Interim controls (between $5,000 and $25,000 of federal assistance per unit) are an effective method <br />for containing LBP hazards while remaining relatively cost effective. "Interim controls" means a set of <br />measures designed to reduce temporarily human exposure or likely exposure to LBP hazards. Interim <br />controls include, but are not limited to, repairs, painting, temporary containment, specialized cleaning, <br />clearance, ongoing LBP maintenance activities, and the establishment and operation of management <br />and resident education programs. <br />The City has determined that, in general, the ongoing cost associated with interim controls (specifically <br />in terms of ongoing LBP maintenance) far outweighs the cost of abatement. <br />The City uses the following HUD criteria in conducting its lead-based paint assessments. <br />• Exempt — If constructed in 1978 or later, no paint disturbed, zero bedroom or studio units, <br />elderly/disabled resident(s) with no children under 6, unit is lead-based paint free, and/or used no more <br />than 100 days in a year. <br />• Lead Safe Work Practice (24 CFR 35.930(b)) - If hard costs are less than $5,000 <br />• Interim Controls or Standard Practices (24 CFR 35.930(c)) — Hard costs $5,000 to $25,000 <br />• Abatement ((24 CFR 35.930(d)) — Hard costs are greater than $25,000 <br />Consolidated Plan REDWOOD CITY 130 <br />OMB Control No: 2506-0117 (exp. 06/30/2018) <br />492 <br />
The URL can be used to link to this page
Your browser does not support the video tag.