My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-06-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-06-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:41:57 PM
Creation date
6/20/2019 6:01:33 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
791
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.T. - Page 236 of 406 <br />Ground Support Unit <br />Responsible for coordinating the allocation of construction and other field support resources required to <br />restore roadways, remove debris, pump flood water and provide transportable sources of water, <br />lighting and power during emergency response and recovery operations. <br />ELEMENTS INCLUDE: <br />• In coordination with building and engineering, public works Branch Coordinators and the <br />Situation Analysis Unit, develop a ground support plan to support field operations <br />• Arrange for the acquisition or use of required ground support resources <br />Reports to: <br />Logistics Support Branch Director <br />Plans and Reports: <br />• EOC Action Plan <br />• Ground Support Plan <br />Forms and Guides: <br />• POSITION JOB AID <br />• ICS -205 COMMUNICATION LIST <br />• ICS -211 CHECK-IN LIST <br />• ICS -214 ACTIVITY LOG <br />• RESOURCE TRACKING REPORT <br />• GROUND SUPPORT EQUIPMENT STATUS <br />Technology: <br />• LAPTOP <br />• PHONE (DESK OR CELL) <br />Tools: <br />• WORKSTATION <br />• POSITION BINDER (CAN BE VIRTUAL) <br />• VEST <br />Activation: <br />Check-in at the EOC <br />• FORM: ICS -211 <br />• FORM: ICS -205 <br />❑ Assist with EOC Set-up (if not already fully set-up) <br />❑ Check work station to ensure readiness <br />❑ Wear identification vest and read overjob aid <br />C-118 <br />509 <br />
The URL can be used to link to this page
Your browser does not support the video tag.