Laserfiche WebLink
Green Building Standards Code for future installation and use of EV chargers. Electric <br />vehicle supply equipment shall be installed in accordance with the California <br />Electrical Code, Article 625.. [COA] [ENGINEERING] <br />14. Air Conditioning Units - Air conditioning unit noise shall be limited to 55 dBA as <br />measured at the property line. [COA] [PLANNING] <br />Final Mau <br />15. Final Map -Obtain approval and record a Final Map prior to building permit issuance. <br />All final maps shall include the lot configuration and proposed easements and <br />conform to the Subdivision Map Act and Chapter 30 of the Municipal Code. <br />[SDR] [ENGINEERING] <br />16. Agreements - Prior to Final Map approval, enter into the following agreements in a <br />form acceptable to the City Attorney and the Community Development Director: <br />[COA] [ENGINEERING] <br />a. A Landscape Maintenance Agreement for all assigned landscape areas in <br />public rights of way, easements, and/or on property in which the City holds <br />an interest to be maintained. Maintenance items shall include, but are not <br />limited to, planting trees, shrubs, flowers, grass and all appurtenances <br />including irrigation systems and pedestrian scale lighting. <br />b. A Stormwater Treatment Measures Maintenance Agreement for all on- <br />site stormwater treatment measures associated with the project. <br />c. An Improvement Agreement to guarantee the installation of all <br />improvements required of the project and to provide for payment of all City <br />inspection and plan check charges associated with the installation of public <br />and private improvements, including, but not limited to, streets, sanitary <br />sewers, water, storm drains and street lights. <br />d. CC&Rs including provisions for maintenance of and access to shared utilities, <br />stormwater treatment facilities, surface improvements, and common areas, <br />and an estimate of costs and proposed level of maintenance for each of the <br />activities identified. All property owners must be members. <br />[COA] [PLANNING] <br />Reports and Surveys <br />17. Geotechnical Report - Include a geotechnical field review and reports for all grading <br />work, prepared by a licensed geotechnical engineer and in conformance with <br />Engineering Standards, Volumes II & III, CBC, and other State regulations. This shall <br />be submitted as part of the building permit application. [SDR] [ENGINEERING] <br />18. As-Builts - Provide "as -built" or "record" drawings, to be submitted in paper, PDF and <br />AutoCAD formats prior to project sign -off. [COA] [ENGINEERING] <br />ATTY/RESO.0108/PC RESO APPROVING PERMITS TO 211-217 VERA AVENUE <br />REV: 12-05-18 PR <br />Page 9 of 17 <br />