My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15780
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2019
>
Res19 15780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2019 12:42:36 PM
Creation date
6/26/2019 12:42:11 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY <br />was performed for GI project categories within each model subwatershed and <br />municipal jurisdiction, and supports the selection of the most cost-effective <br />implementation strategy to attain pollutant reduction goals. The RAA builds <br />upon the previous planning efforts and represents the following generalized <br />GI project categories in the model: <br />• Existing Projects: Stormwater treatment and GI projects that have <br />been implemented since FY -2004/05. This primarily consists of all of <br />the regulated projects that were mandated to treat runoff via <br />Provision C.3 of the MRP, but also includes any public green street <br />or other demonstration projects that were not subject to Provision <br />C.3 requirements. For regulated projects in the early years of C.3 <br />implementation, stormwater treatment may have been achieved <br />through non -GI means, such as underground vault systems or media <br />filters. <br />• Future New Development and Redevelopment: All the regulated <br />projects that will be subject to Provision C.3 requirements to treat <br />runoff via LID and is based on spatial projections of future new and <br />redevelopment tied to regional models for population and <br />employment growth. <br />• Regional Projects (identified): C/CAG worked with agencies to <br />identify five projects within public parks or Caltrans property to <br />provide regional capture and infiltration/treatment of stormwater, <br />and included conceptual designs to support further planning and <br />designs. Note — the model can be updated to include future <br />identified projects to support adaptive management. <br />• Green Streets: The SRP identified and prioritized opportunities <br />throughout San Mateo County for retrofitting existing streets with <br />GI in public rights-of-way. Green streets were ranked as high, <br />medium, and low priority (within each subwatershed) based on a <br />multiple -benefit prioritization process developed for the SRP. <br />• Other GI Projects (to be determined): Other types of GI projects on <br />publicly owned parcels, representing a combination of either <br />additional parcel -based GI or other Regional Projects. The SRP <br />screened and prioritized public parcels for opportunities for onsite <br />LID and Regional Projects. These opportunities need further <br />investigation to determine the best potential projects. <br />The RAA considers the numerous GI project opportunities that exist within <br />each municipal jurisdiction, and selects a suite or "recipe" of projects that can <br />most cost-effectively address pollutant load reductions. The amount and <br />combination of those GI projects can be determined through analysis of <br />estimated load reductions and implementation costs. Figure 4 presents an <br />example GI recipe showing the distribution of selected GI project categories <br />versus incremental reductions in pollutant loading and increasing cost. Cost- <br />RWC GREEN INFRASTRUCTURE PLAN <br />GREEN INFRASTRUCTURE PLAN <br />® Future New and Redevelopment <br />........................ --------------- ---------- <br />0 Existing Projects <br />Implementation Cost s) <br />Figure 4. Example Implementation <br />Recipe Showing <br />General Sequencing of <br />GI Projects. <br />15 JUNE 2019 <br />ATTY/RESO.0075/CC RESO APPROVING THE GREEN INFRASTRUCTURE PLAN — EXHIBITA RESO. NO. 15780 <br />REV: 06-20-19 PR MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.