Laserfiche WebLink
REDWOOD CITY <br />GREEN INFRASTRUCTURE PLAN <br />Redwood Shores <br />Library Art Play <br />Structure and <br />This project will install a public art piece <br />Playground — <br />with a public accessible playground. <br />Planning <br />Still Evaluating <br />399 Marine Pkwy <br />The Middlefield Road project includes <br />Middlefield Road Utility <br />construction of a joint utility trench (JUT) <br />Underground Project— <br />to accommodate new and relocated <br />underground electrical and <br />Design Complete <br />Yes <br />telecommunication lines, as well as <br />streetscape improvements between Main <br />Middlefield Road <br />Street and Woodside Road. <br />between Woodside <br />Road and Main Street <br />Hopkins Traffic Calming <br />This project will install traffic calming <br />Project <br />measures based on Public outreach in the <br />neighborhood surrounding the project <br />Pilot Program <br />Still Evaluating <br />Hopkins Ave between <br />area <br />Broadway and Alameda <br />De Las Pulgas <br />4.3 Workplan for Completion <br />As identified in Section 2.7 the City intends to construct the Regional <br />Stormwater Capture Project at Red Morton Community Park between 2030- <br />2040. Since that project and the development policiesare intended to meet <br />the goals of the MRP, any other CIP projects with the inclusion of GI will not <br />be considered a priority. This will need to be revisited from time to time, and <br />will be part of the City's adaptation plan (Section 8). <br />RWC GREEN INFRASTRUCTURE PLAN <br />29 JUNE 2019 <br />ATN/RESO.0075/CC RESO APPROVING THE GREEN INFRASTRUCTURE PLAN — EXHIBITA RESO. NO. 15780 <br />REV: 06-20-19 PR MUFF NO. 802 <br />