Laserfiche WebLink
8 Adaptive Management.........................................................................39 <br />8.1 Process for Plan Updates...................................................................39 <br />8.2 Pursuing Future Funding Sources.......................................................39 <br />8.3 Alternative Compliance and Credit Trading Investigations ................ 39 <br />9 References............................................................................................40 <br />Tables <br />Table 1. Model scenarios objectives and cost -benefit evaluation ................. 17 <br />Table 2. Scenario 1: GI implementation strategy for Redwood City (sediment <br />target, with regional identified project).................................................21 <br />Table 3. CIP Projects with Green Infrastructure Potential...............................26 <br />Figures <br />Figure 1. RAA Process Flow Chart (USEPA 2017) ............................................10 <br />Figure 2. SRP Prioritized Green Street Opportunities.....................................11 <br />Figure 3. Modeling System Supporting the RAA.............................................14 <br />Figure 4. Example Implementation Recipe Showing General Sequencing of GI <br />Projects...................................................................................................15 <br />Figure 5. Modeling System Supporting the RAA.............................................19 <br />Figure 6. Scenario 1: Optimization summary for Redwood City (sediment <br />target, with regional identified project).................................................20 <br />Figure 7. Scenario 1: Map of GI capacities within each subwatershed of <br />Redwood City (sediment target, with regional identified project) ......... <br />22 <br />Figure 8. Summary GI capacity for interim and final implementation <br />milestones.............................................................................................. <br />24 <br />Appendices (links) <br />A. Resolution adopting GI Work Plan. <br />B. Regional Stormwater Capture Project at Red Morton Community Park <br />C. Phase I Baseline Modeling Report — Provides documentation of the <br />development, calibration, and validation of the baseline hydrology and <br />water quality model, and the determination of PCB and mercury load <br />reductions to be addressed through GI implementation (SMCWPPP 2018). <br />D. Phase II Green Infrastructure Modeling Report— Provides documentation <br />of the application of models to determine the most cost-effective GI <br />RESO. NO. 15780 <br />MUFF NO. 802 <br />