My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 CA State Water Resources Board
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 CA State Water Resources Board
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 9:42:57 AM
Creation date
7/9/2019 9:33:58 AM
Metadata
Fields
Template:
Agreement
Contractor Name
CA State Warter Resources Board
PROJECT NAME
Prop 1 Storm Water Grant
RMP File Number
505
Date
5/23/2019
Reso Ref
15695
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Redwood City <br />Agreement No. MI1-2fiFiSSWRCB0000000000D171265500 <br />Amendment 1 <br />Page 12 of 29 <br />A-6. Submittal Schedule <br />Failure to provide items by the due dates indicated in the Submittal Schedule below may constitute a <br />material violation of this Agreement. However, the dates in the "Estimated Due Date" column of this <br />Submittal Schedule may be adjusted as necessary during the Disbursement Period with Grant Manager <br />approval. All work or submittals must be achieved with relevant submittals approved by the Division prior <br />to the Work Completion Date, and the final Disbursement Request submitted prior to the Final <br />Disbursement Request Date set forth in Exhibit B. <br />ITEM <br />DESCRIPTION OF SUBMITTAL <br />CRITICAL DUE <br />DATE <br />ESTIMATED DUE <br />DATE <br />EXHIBIT A-3 PROJECT -SPECIFIC SCOPE OF WORK <br />1. <br />Project Management <br />1.2 <br />Notification of Upcoming Meetings, Workshops, and <br />Trainings <br />As Needed <br />1.3 <br />Detailed Project Schedule <br />39 Bays -After <br />€xeGutienComplete <br />1.4 <br />Periodic and Final Site Visits <br />As Needed <br />1.5 <br />Photo Documentation <br />As Needed <br />2. <br />General Compliance Requirements/Project Effectiveness and Performance <br />2.1 <br />GPS Information <br />30 Bays After <br />€xeeutienComplete <br />2.2 <br />PAEP <br />30 Days After <br />ExgrutienComplete <br />3. <br />Permitting and Environmental Compliance <br />3.1.1 <br />Final CEQA Document <br />Complete <br />3.2 <br />List of Approvals, Entitlements or Permits <br />Ongoing <br />4. <br />Planning, Design, and Engineering <br />4.1 <br />50% Design Plans and Specifications <br />Auger" <br />2043Complete <br />4.2 <br />100% Design Plans and Specifications and Summary <br />of Changes <br />September <br />204SComplete <br />4.3 <br />Advertised Bid Documents and Bid Summary <br />Qsteber <br />204,9 oq lete <br />5. <br />Construction and Implementation <br />5.1 <br />Notice(s) to Proceed and Awarded Contract(s) <br />IDGG8Mber 31, <br />201 RJune 30, 2019 <br />5.3 <br />Proposed Changes <br />Ongoing <br />5.4 <br />As -built Drawings and Summary of Changes <br />May <br />201-9September <br />2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.