My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 8:51:57 AM
Creation date
7/11/2019 8:51:49 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Casey Construction, Inc.
PROJECT NAME
2018-2019 Sanitary Sewer Replacement Project
RMP File Number
304
Date
7/9/2019
MO Ref
19-121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(150) Calendar Days from the date the Contract Time commences to run. <br />B. Liquidated Damages <br />1. City and Contractor recognize that time is of the essence of this Agreement <br />and that City will suffer financial loss in the form of lost revenues, contract <br />administration expenses (including project management and consultants' <br />expenses), delay and loss of public use, if the Work is not completed within <br />the time specified in paragraph 3.1 above plus any extensions thereof allowed <br />in accordance with the Contract documents. Consistent with Document 00700 <br />(General Conditions), Contractor and City agree that because of the nature of <br />the Project, it would be impractical or extremely difficult to fix the amount of <br />actual damages incurred by City because of a delay in completion of the Work. <br />2. Accordingly, City and Contractor agree that Contractor shall pay City one <br />thousand five hundred and No/100 dollars ($ 1,500.00) for each Day that <br />expires after the time specified in Paragraph 3.1 of this Document 00520 for <br />Contractor to achieve Substantial Completion, until such date as contractor <br />achieves Substantial Completion. <br />C. Liquidated damages for delay shall only cover and be in lieu of the actual damages <br />suffered by City as a result of delay referenced above. Liquidated damages shall not <br />cover the cost of completion of the Work, damages resulting from defective work, cost <br />of temporary replacement facilities, damages suffered by others who then seek to <br />recover their damages from City (for example, delay claims of other contractors or <br />subcontractors), and defense costs thereof. <br />IV. CITY'S ENGINEER AND REPRESENTATIVES <br />Reserved <br />V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br />In order to induce City to enter into this Agreement, Contractor makes the following <br />representations and warranties: <br />A. Contractor has visited the Site and has examined thoroughly and understood the <br />nature and extent of the Work, Site, locality, actual conditions, as built conditions, and <br />all local conditions and federal, state and local laws and regulations that in any <br />manner may affect cost, progress, performance or furnishing of Work or which relate <br />to any aspect of the design and the means, methods, techniques, sequences or <br />procedures of construction to be employed by Contractor and safety precautions and <br />programs incident thereto. <br />B. Contractor has examined thoroughly and understood all reports of exploration and <br />tests of subsurface conditions, drawings or reports, available for design and <br />construction purposes, of physical conditions, or which may be apparent at the Site <br />and accepts the determination set forth in these documents and Document 00700 <br />(General Conditions) of the limited extent of the information contained in these <br />documents upon which the Contractor may be entitled to rely. Contractor agrees that <br />except for the information so identified, Contractor does not and shall not rely on any <br />other information contained in these Sections. <br />C. Contractor has considered the physical conditions at or contiguous to the Site or <br />2018-2019 SANITARY SEWER REPLACEMENT PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.