My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-07-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-07-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:40:03 PM
Creation date
7/18/2019 3:58:40 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/22/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.B. - Page 24 of 28 <br />Appendix 5: Utilities Evaluation <br />Page 18 <br />Project demands included, to determine the hydraulic impact of the Project on the City's <br />recycled water system. Utilize hydraulic evaluation criteria provided by the City for the <br />recycled water system operation. <br />• Develop Revised Layout Plan for Downtown Area: Coordinate with the City to develop a <br />revised layout plan for the recycled water pipelines within the City's Zone 2C of the <br />recycled water system, south of Marshall Street. Locations for customers will be provided <br />by the City. One layout plan will be incorporated into the hydraulic model. The hydraulic <br />evaluation criteria provided by the City for the recycled water system operation will be used <br />to size the revised layout plan. Existing utilities will be considered when selecting <br />alignments, but a full alignment study is not included. <br />Task 2. Citv Data Requirements: <br />• Recycled water demands for the Project area for existing and buildout conditions <br />• Most recent version of the recycled water model <br />• List of recycled water customers to be considered with associated demands to use <br />Task 3. Evaluate Sewer Collection System <br />Consultant will perform a sewer collection system analysis to determine sewer collection system <br />infrastructure requirements to serve the Project. The following work will be performed: <br />• Update the Hydraulic Model: Update the City's existing sewer collection system hydraulic model <br />to include proposed sewer mains identified in the Preliminary Utility Study and allocate dry - <br />weather and wet -weather flows provided by the City for the Project. The design storm used for <br />the wet -weather flows will be identified. Hydraulic model files will be provided in Info works <br />ICM and EPASWMM format. Up to four flow split manholes within the project area will be <br />identified and field verified. <br />• Perform Hydraulic Evaluation of Available and Needed Capacity: Perform a hydraulic <br />analysis for the sewer collection system to calculate available and needed dry -weather and <br />wet -weather capacity for new facilities to serve the Project and for existing facilities <br />downstream of the development area. Perform the analysis for existing conditions and for <br />buildout conditions with the demands for the Project included to determine the hydraulic <br />impact of the Project on the City's sewer collection system. Identify impacts to the Maple <br />Sanitary Sewer Pump Station and coordinate with Silicon Valley Clean Water's recent <br />analysis of this pump station. Utilize hydraulic evaluation criteria in the City's Sewer <br />Collection. System Master Plan for the collection system performance criteria. <br />Perform Condition Assessment: Perform up to three CCTV inspections of gravity sewers within <br />the project area. These have been identified as along Elm Street between Lathrop Street and Main <br />Street, along the railroad right-of-way between Elm Street and Cedar Street and along Maple Street <br />between El Camino Real and Middlefield Road. Review the video and log files for the three CCTV <br />inspections performed within this task. Review log files provided by the City for the immediate <br />project area. Spot check the CCTV videos files to confirm the PACP grade 5 defects identified in <br />the log files (assume there are no more than five of these). Identify any defects that will be made <br />worse if not migrated by the project. The PACP grade 3, 4 and 5 defects will be identified and <br />ATTY/AGR/2019/AMEN DM ENTS/AM END N 0.1- AECO M <br />REV: 06-17-19 PR <br />Page 18 of 22 <br />45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.