My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-07-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-07-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:40:03 PM
Creation date
7/18/2019 3:58:40 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/22/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 9 of 53 <br />Redwood City Cnde, the stricter requirement or standard shall govern, as determined by the City <br />Engineer. <br />4, Completion Date. Developer will complete the Work within one year of the Effective <br />Date. All Work will be completed h) a good and workmanlike manner in accordance with accepted <br />design and construction practices and consistent with the Improvet.nent Flans. This completion date may <br />be extended by the City Engineer in his or her sole and absolute discretion at the request of Developer, <br />which request shall be accompanied by a written assurance acceptable to the City Engineer that the <br />securities required by Section 13 shall remain enforceable throughout the term of the extension. <br />5. Estimated Cost of Work. The engineer's estimated cost of the Work is One Hundred and <br />Three Thousand, One Hundred Sixty -Eight Dollars ($103,168.00) ("Estimated Cost of Work"): <br />6. Modifications to the. Plans. Approval of this Agreement by City does not release. <br />Developer of its responsibility to correct mistakes, errors or omissions in the Improvement Plans. if, at <br />any time, in the opinion of the City Engineer_ in his reasana.ble discretion, the Improvement Plans are <br />deemed inadequate in any respect, Developer agrees to make such modifications, changes or revisions as <br />necessary in order to complete the Work in a good and workmanlike manner in accordance with accepted <br />design and construction standards and consistent with the Conditions and Tmprovernent Flans. <br />7. Repairs- Developer agrees to repair or have repaired in a timely manner at its sale cost <br />and expense all public roads, streets, or other public or private property damaged as a result of or <br />incidental to the Work or in connection with the development of the Property, or to pay to the property <br />owner of any damaged road, street or property the full cost of such repair. In addition, Developer shall <br />obtain the written acceptance of such repair or payment from any owner whose private or public property <br />was repaired by :Developer or to whore Developer has paid the full cost of such repair in accordance with <br />this Section 7. City shall be under no obligation whatsoever to accept the Work completed raider this <br />Agreement until such time as all repairs have been completed or have been paid for and written <br />acceptances have been provided to the City Engineer. <br />8. Foreman. or Superintendent, Developer shall give personal attention to the Work. A <br />competent foreman or superintendent, satisfactory to the. City Engineer in his reasonable discretion with <br />authority to act for and on behalf of Developer, shall be named in writing by Developer prior to <br />commencement of the Work, shall be present on the Property during the performance of the Work and <br />may not be changed will -tout advance notification to and the eoneurreme of the City Engineer. <br />9. Examination. of Work. All of the Work shall be consistent Willi the Uproveivent Plans <br />and performed to the satisfaction of the City Engineer, in.. his reasonable discretion. City and its <br />authorized agents shall, at all times during the performance of the Work, nave tree acecss to the Property <br />and the Work and shall be allowed to examine the Work olid all materials used and to be used in the <br />Work. <br />10. City Costs; Deposit, Developer shall pay to City the actual cost for all engineering, <br />inspection; administration, plan check, laboratory and fieldtesting, construction; and other services <br />furnished by City in connection with this Agreement, including those performed by consultants under <br />contract with City ("City Costs"). Developer shall deposit with City the sum of Nifty Thousand and <br />'NO) 100 Dollars ($50,000.00) ("Deposit") to compensate City for all City Casts, Developer understands <br />That the Deposit .is an estimate and further agrees to pay to City the actual cost of providing such services, <br />in accordance with the City's current fees. Developer agrees to complete payment of such. additional sum <br />or .sums for the services provided by City, if any, within ten (10) clays after billing by City of the <br />additional sura to be paid and agrees that the amount payable shall be increased by ten percent (10%) in <br />RFV: 06-29=19 PR <br />Page 3 of 19 <br />ATTYIAGR.2019-1961Habitatfor Humanity Greater San Francisco 64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.