My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-08-26 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-08-26 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:00:32 AM
Creation date
8/23/2019 8:26:02 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/26/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.F. -Page 12 of 13 <br />The following assumptions and conditions underlie Consultant's FOR costs: <br />1) The costs for this proposal reflect Consultant's 2019 Harbor View Project <br />Schedule of Fees and current fee rates for its subconsultants. <br />2) Consultant's scope of work includes public mailings of notices to designated public <br />and quasi -public agencies, County Clerk, and the State Clearinghouse, and Final <br />EIR documents to commenting public 1 quasi -public agencies. Consultant assumes <br />the City will conduct all mailings (including Final EIR documents where applicable) to <br />the general public, interested parties, and internal City distributions, as well as the <br />preparation, placement and payment of all newspaper notices. <br />3) Consultant's scope of work does not include preparation of City staff reports, <br />however, Task 3 does include drafting CEQA Findings for City staff to finalize. <br />4) No substantial changes will be made to the Revised Project and related materials <br />after the Consultant initiates work on the environmental analysis. <br />5) City staff or its consultant will provide to Consultant an updated water supply <br />assessment for the Revised Project, if it is determined by the City that one is <br />warranted given the reduced development program. <br />6) If the City directs that updated photosimulations or shadow studies be prepared for <br />the Revised Project, then the Project sponsor's qualified architect will prepare <br />these documents, which the Consultant will peer review. <br />Page 9 of 10 <br />REV: 08-06-19 PR <br />ATTYIAGR.Amend No. 21ESA Harbor View Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.