My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord 2465
RedwoodCity
>
City Clerk
>
Ordinances
>
2010-2019
>
2019
>
Ord 2465
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2019 9:18:51 AM
Creation date
8/27/2019 5:02:18 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
8/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />08/26/2019 <br />detention/retention units, green roofs, or infiltration structures, shall be designed <br />to treat stormwater runoff equal to: <br />a. The maximized stormwater quality capture volume for the area, based on <br />historical rainfall records, determined using the formula and volume capture <br />coefficients set forth in Urban Runoff Quality Management, WEF Manual of <br />Practice No. 23/ASCE Manual of Practice No. 87 (1998), pages 175—178 <br />(e.g., approximately the eighty-fifth (85th) percentile twenty-four (24) hour <br />storm runoff event); or <br />b. The volume of annual runoff required to achieve eighty percent (80%) of more <br />capture, determined in accordance with the methodology set forth in the <br />California Stormwater Best Management Practices Handbook for New <br />Development and Redevelopment (2003), using local rainfall data. <br />2. Flow Hydraulic Design Basis: Stormwater treatment measures that treat <br />pollutants from a moving stream of water through filtration, infiltration, <br />sedimentation and/or biological processes, whose primary mode of action <br />depends on flow capacity, such as swalesbio-retention areas, flow-through <br />planters, tree well filters, or media filters, sand filters, or wetlands, shall be sized <br />to treat: <br />a. Ten percent (10%) of the fifty (50) year peak flow rate; <br />b. The flow of runoff produced by a rain event equal to at least two times the <br />eighty-fifth (85th) percentile hourly rainfall intensity for the applicable area, <br />based on historical records of hourly rainfall depths; or <br />c. The flow of runoff resulting from a rain event equal to at least 0.2 inches per <br />hour intensity (also known as the “4 percent method”). <br />3. Combination Flow and Volume Design Basis: For projects on sites where <br />infiltration should be avoided, or that are planned to maximize density at a <br />redevelopment or infill site, a combination flow and volume design basis may be <br />used for bio-retention areas and flow-through planters. These treatment <br />measures shall be sized to treat at least 80 percent of the total runoff over the <br />life of the project, using local rainfall data and the methodology set forth in the <br />C.3 Stormwater Technical Guidance, written by the San Mateo Countywide <br />Water Pollution Prevention Program. <br />C. Stormwater treatment measures proposed as part of a project’s permanent <br />stormwater pollution prevention measures shall be designed in accordance with the <br />City’s Green Infrastructure Plan established by resolution of the City Council, which <br />may be amended from time to time. <br /> <br />D. All plans and construction of stormwater treatment measures are subject to <br />inspection and approval by the City Engineer. <br /> <br />ATTY/ORD.488/CC ORDINANCE AMENDING CHAPTER 18 & 27A – GREEN INFRASTRUCTURE ORDINANCE NO. 2465 <br />REV: 06-20-19 PR MUFF NO. 802 <br />Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.