My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-09-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-09-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:33:55 PM
Creation date
9/5/2019 5:14:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/9/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 1 of 15 <br />/<�ik <br />Redwood <br />CitylCallifornia <br />Founded 1867 <br />\low <br />DATE: September 9, 2019 <br />SUBJECT <br />STAFF REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />Study Session for the South Main Mixed -Use Project (Greystar V) located between EI Camino Real, Maple, <br />Cedar and Main Streets and an offsite affordable housing development at 1304 EI Camino Real (at Jackson <br />Avenue) <br />RECOMMENDATION <br />Receive public comment and provide individual Councilmember comment on overall impressions of the <br />project application. No action is requested at this time. A formal action would be requested at a future City <br />Council meeting. <br />STRATEGIC INITIATIVE <br />Housing <br />BACKGROUND <br />The Project site is located at the periphery of the Downtown Precise Plan area and is composed of six blocks <br />totaling 8.30 acres (Parcels A through F). Parcels A through E are bounded by EI Camino Real, Maple Street, <br />Elm Street, Main Street, Caltrain right-of-way, Chestnut Street, Shasta Street, and Cedar Street. Parcel F is <br />approximately 1,000 feet northwest of Parcels A through E at the southwest corner of EI Camino Real and <br />Jackson Avenue (Figure 1— Project Location and Context). <br />Existing use of the project site is primarily auto sales, repair, and warehouse space, including one multi - <br />tenant residential building owned by the City of Redwood City, a restaurant, and a former indoor roller rink. <br />Uses surrounding the site include auto repair shops, small commercial buildings, large multi -tenant <br />residential developments, some retail, and a proposed 109,000 -square foot office building. <br />127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.