Laserfiche WebLink
Electric Buildings - Single and Two-family New Construction <br />Meet Title 24 Energy Meet Title 24 Energy Meet Title 24 Energy Exceed Title 24 Energy <br />Requirements using: Requirements using: Requirements using: Requirements using: <br />• Performance (energy • Performance or • Performance or • Performance (10 EDR <br />modelling) or <br />• Prescriptive (measures) <br />Solar generation ready <br />zone in subdivisions <br />with ten or more <br />buildings <br />• Prescriptive <br />Requires solar generation <br />• Prescriptive <br />Requires solar generation <br />Required adjacent outlet for Use electric appliances <br />future electric replacement: <br />• Gas water heaters <br />*Option to exempt Accessory Dwelling Units (ADUs) <br />points) <br />• Prescriptive (additional <br />measures) <br />Requires solar generation + <br />• Solar water heating OR <br />• 5 kWh battery <br />Required adjacent outlet for <br />future electric replacement: <br />• Gas water heaters <br />• Gas clothes dryers <br />• Gas ranges and stoves <br />PENINSULAQCLEAN ENERGYI 10 <br />