My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-09-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-09-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:28:42 PM
Creation date
9/19/2019 1:35:36 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/23/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
$12.4K <br />All Electric is Less Expensive to Build <br />Average Construction Cost Comparison: Gas vs Electric (New Construction, California) <br />$10.4K <br />$4.8K $4.3K <br />a Gas Electric <br />$1.9K $1.9K <br />Heater Water Heater Clothes Drying <br />Lower Construction Cost <br />—$1Ok less to build an all -electric home <br />IW <br />$1.6K $2.OK <br />Cookstove <br />$2.5K <br />.A $O.OK <br />Gas Piping <br />During Construction is the Right Time <br />2x -5x less expensive to install now than later <br />Capital costs of thermal systems are based on eThree Study: Residential Building Electrification in California, April 2019 <br />$6.OK <br />$O.OK <br />Gas Connection <br />PENINSULAQCLEAN ENERGYI 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.