My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-09-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-09-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:28:42 PM
Creation date
9/19/2019 1:35:36 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/23/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Santana Row Lot 11 <br />UC Davis Webster Hall Replacement <br />American Geophysical Union <br />Hormoz Janssens, Principal <br />Almost all our projects are all -electric, I have only been using gas systems <br />where required by the client. <br />Electric is almost always less expensive or cost neutral. Very rarely is it <br />more expensive. Often it is our value engineering option. <br />Most project types work just fine. We are doing a 500,000 sf all electric <br />office for Microsoft, with major cost savings using heat pumps vs a <br />central plant. <br />We do lots of detailed cost analysis with developers to find the most <br />cost-effective solution. For example, at Bay Meadows our all electric <br />design for 1 million sf of development was significantly less expensive <br />than a traditional rooftop package unit + boiler + reheat system. <br />ehdd,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.