Laserfiche WebLink
J. Craig Venter Institute Lab, San Diego <br />SFO Consolidated Admin Facility <br />Integrated Genomics Lab, LBNL <br />Eric Solrain. Princi <br />INTEGRAL <br />GROUP <br />Integral currently has dozens of all -electric buildings recently complete, in <br />construction, and in design. There has been a big sea change in recent <br />years towards all -electric. Around 50% of our work is currently electric. <br />There is lot of momentum in Multi -family Residential and in Commercial <br />projects moving to electric systems. <br />Comparing the construction cost of all -electric to gas depends on what <br />you are comparing it to. If comparing to a high-performance design such <br />as LEED Gold then all -electric is cheaper. If comparing to moderate <br />performance building then all -electric is cost neutral. If comparing to the <br />most basic design, there may be a small cost premium. <br />There are some significant code changes in California energy code in 2019 <br />that will make all electric even more cost competitive, especially for <br />multifamily. <br />ehdd. <br />