My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-10-14 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-10-14 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:23:40 PM
Creation date
10/10/2019 5:36:08 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E. - Page 14 of 27 <br />EXHIBIT "A" <br />SCOPE OF SERVICES <br />Consultant shall provide thefollowing Services: <br />Phase 1: feasibility analysis for a site(s) that meets minimum and <br />optimum parcel size requirements <br />Task 1.1 Kick-off Meeting to discuss a workplan and develop a schedule <br />Consultant shall meet with key City staff to discuss parameters of the study, <br />and prepare a work plan, and next steps, and drat a schedule, <br />Deliverables: <br />a. Work plan - <br />b. Schedule <br />Task 1.2 Site(s) Analysis and Assessment Report <br />Consultant shall provide technical site analysis that demonstrates the <br />opportunity and constraints of sites identified as available for their intended <br />use. The summary site analysis should Include: <br />• Location <br />• Existing land usedesignation <br />• Utilities <br />• Current uses, if any <br />• Approximate size of pareel(s) <br />• Site aboessibillty <br />• Parking <br />• Site constraints, if any <br />Deliverable: <br />a. Site(s) analysis and assessment report <br />Task 1.3 Cost Analysis for land, construction and operating costs. <br />Consultant shall provide a cost analysis for each site identified. The cost <br />analysis should be incorporated into the opportunities and constraints <br />presentation. <br />1.2. The cost analysis should include, but not be limited to: <br />• Probable land and construction costs <br />• Probable operation costs, ifany <br />REV: 07-24-19 RL <br />Page 11. of 14 <br />ATTYIAGR.2019.2071LPA, Inc. 179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.