Laserfiche WebLink
12/12/2011 <br /> Tank <br /> 31. High-pile Storage 1.00 $167.00 $25.00 <br /> 32. High-rise Occupancy 3.00 $501.00 N/A <br /> 33. Hot Work Operations 1.00 $167.00 $25.00 <br /> 34. Institutional/Residential Care 1.00 $167.00 N/A <br /> Occupancies <br /> 35. Institutional/Residential/Daycare 1.00 $25.00 N/A <br /> Occupancy Pre-Licensing /nspection <br /> (set by State Statute) <br /> 36. Liquefied Petroleum Gases 1.00 $167.00 $25.00 <br /> 37. Lumber Yards and Woodworking Plants 1.00 $167.00 $25.00 <br /> 38. Miscellaneous Fire and Life Safety 1.00 $167.00 $25.00 <br /> Inspections <br /> 39. Place of Assembly 1.00 $167.00 $25.00 <br /> 40. Pyrotechnical Special Effects Material 2.00 $334.00 $25.00 <br /> 41. Repair Garages and Motor Fuel 1.00 $167.00 $25.00 <br /> Dispensing Faculties � <br /> 42. Spraying or Dipping 1.00 $167.00 $25.00 <br /> 43. Tents and Air Supported Structures 1.00 $167.00 $25.00 <br /> 44. Tire Storage 1.00 $167.00 $25.00 <br /> 45. Wood Products 1.00 $167.00 $25.00 <br /> Effective January 1, 2013 and each January 1 thereafter, the then current fees (as listed <br /> above) shall be revised by a percentage equal to the percentage change in the annual <br /> San Francisco-Oakland-San Jose consumer Price Index - All Urban consumers <br /> (CPI-U-SF) for the previous 12-month period comprised of July 1 through June 30� At <br /> least sixty days prior to each year's fee adjustment, the Fire Chief shall calculate the fee <br /> adjustment and report the revised fee amount to the City Council. <br /> ATTY/RES02176/FIRE FEE SCHEDULE RESO. # 15158 <br /> REV: tv29Jtt 5 MUFF # 505 <br />