Laserfiche WebLink
09/10/2012 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT <br /> Responsibility <br /> Impact Mitigation Timeframe for for Oversight of <br /> Implementation Implementation <br /> Implementation <br /> Structures set back Mitigation Measure GEO-3: The structure on Lot 3 is sited less Prior to issuance Building plans City Building <br /> less than 30 feet from than 30 feet from the toe of the Cordilleras Creek embankment, of a grading or submitted to the Official <br /> creek toe of bank are therefore the foundation shall be supported on a drilled pier and building permit City by the <br /> at risk from sudden grade beam foundation systems, designed as recommended in the project applicant <br /> bank failure. A small BAGG Geotechnical Report. The project proposes to construct shall incorporate <br /> portion ofthe home homes on Lots 1-4 on pier and grade beam foundations, even the foundation <br /> proposed on Lot 3 when further than 30 feet from toe of bank, to ensure that design <br /> would encroach construction of the proposed project would not expose people or parameters <br /> within 30 feet of the structures to potential substantial adverse effects, including the identified in the <br /> toe of bank. As risk of loss, injury, or death involving landslides ar ground geotechnical <br /> proposed, structures failures. report <br /> on proposed Lots 1, <br /> 2, and 4 would be Less Than Significant Impact with Mitigation <br /> sited a minimum of <br /> 30 feet from the toe <br /> of the creek bank. <br /> Creek bank erosion Mitigation Measure GEO-4: To prevent ongoing erosion from These erosion CA Department of <br /> has occurred at the Prior to <br /> affecting Lot 3,the project developer proposes to install bank protection Fish and Game. <br /> rear of proposed Lot erosion rotection measures consistin of minimall mvasive installation,the <br /> P g Y measures shall be develo er shall <br /> 3, and is expected to construction techni ues as recommended b the Re ional Water p If CA DFG <br /> q Y g installed by the enter into a <br /> continue in the future, Quality Control Board in A Primer on Stream and River developer prior to determines a <br /> thereby causing loss Protection for the Re ulator and Pro am Mana er" Technical Streambed Streambed <br /> g �' g � sale of Lot 3 Alteration <br /> of usable rear yard Reference Circular W.D. 02-#1). These protection measures shall Alteration <br /> area and damage to be installed by the developer prior to sale of Lot 3. Prior to Agreement with Agreement is not <br /> the t ical back ard the CA necessa the re- <br /> YP Y installation,the developer shall enter into a Streambed Alteration rY� <br /> improvements that Agreement with the CA Department of Fish and Game (if Department of vegetation plan <br /> could be placed determined necessary by CA DFG). The developer shall Fish and Game shall be reviewed <br /> (if determined b the Director of <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page 3 <br /> RESO.#15217 <br /> MUFF#613 <br />