My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res12 15217
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res12 15217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:47:45 AM
Creation date
10/11/2019 7:47:39 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYINGTHE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT; ADOPTING CEQA FINDINGS, AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/10/2012 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT <br /> Responsibility <br /> Impact Mitigation Timeframe for for Oversight of <br /> Implementation Implementation Implementation <br /> BIOLOGICAL RESOURCES <br /> Protected birds and Mitigation Measure BIO-2.1: Preconstruction nesting bird Within two weeks The project Director of <br /> bats, and their nests, surveys shall be conducted by a qualified wildlife biologist within of demoiition and developer, prime Planning <br /> may be present in two weeks of demolition/construction activities scheduled to take construction construction <br /> landscaping or place between February 1 and July 31 (breeding season). All trees activities contractor and <br /> structures on site, and within the project area shall be surveyed. If active raptor or scheduled to take any <br /> could be impacted by passerine nests are detected during the pre-construction surveys, a place between subcontractor(s) <br /> tree removal or no-disturbance buffer zone shall be designated and maintained February 1 and <br /> building demolition around the nest until a qualified biologist has determined that the July 31 <br /> during young have fledged from the nest. The size of the no-disturbance <br /> implementation of the zone shall be determined in consultation with the CDFG. <br /> proposed project. <br /> Mitigation Measure BIO-2.2: A minimum of one Within two weeks The project Director of <br /> preconstruction bat survey shall be conducted by a qualified bat of demolition and developer, prime planning <br /> biologist(a biologist holding a CDFG collection permit and a construction construction <br /> Memarandum of Understanding with CDFG allowing the activities contractor and <br /> biologist to handle and collect bats)shall be conducted prior to any <br /> tree removal or demolition activities. If no bats are detected, then subcontractor(s) <br /> no further surveys are required. However, if bats are detected in a <br /> tree or structure on the site, the bats shall be passively <br /> excluded/evicted from the roost area for two consecutive days. <br /> Tree removal and/or demolition shall occur not less than the day <br /> following the two consecutive days of exclusion/eviction. <br /> Less Than Significant Impact with Mitigation <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page 10 <br /> RESO.#15217 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.