My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res12 15217
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res12 15217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:47:45 AM
Creation date
10/11/2019 7:47:39 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYINGTHE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT; ADOPTING CEQA FINDINGS, AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/10/2012 <br /> are being followed. <br /> 10. Prior to the conveyance of any lot, and prior to the release <br /> of the subdivision financial guarantees, the Arborist shall <br /> inspect the individual lot and the overall project, <br /> respectively,to confirm that all tree protection measures, <br /> including any post construction requirements, such as <br /> aeration,mulch beds, and fertilization, have been <br /> satisfactorily completed. <br /> 11. Root Pruning. During and upon completion of any <br /> trenching/grading operation within a tree's dripline, <br /> should any roots greater than one inch(1")in diameter be <br /> damaged, broken or severed, root pruning to include flush <br /> cutting and sealing of exposed roots should be <br /> accomplished under the supervision of a qualified Arborist <br /> to minimize root deterioration beyond the soil line within <br /> twenty-four hours. <br /> 12. Pruning. Pruning of the foliar canopies to include removal <br /> of deadwood is recommended and should be initiated prior <br /> to construction operations. Such pruning will provide any <br /> necessary construction clearance, will lessen the <br /> likelihood or potentiai for limb breakage, reduce <br /> `windsail' effect and provide an environment suitable for <br /> healthy and vigorous growth. <br /> 13. Fertilization. A program of fertilization by means of deep <br /> root soil injection is recommended with applications in <br /> spring and summer for those trees to be impacted by <br /> construction. Such fertilization will serve to stimulate <br /> feeder root development, offset shock/stress as related to <br /> construction and/or environmental factors, encourage <br /> vigor, alleviate soil compaction and compensate for any <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page 14 <br /> RESO.#15217 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.