My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res12 15217
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res12 15217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:47:45 AM
Creation date
10/11/2019 7:47:39 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYINGTHE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT; ADOPTING CEQA FINDINGS, AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/10/2012 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT <br /> Responsibility <br /> Impact Mitigation Timeframe for for Oversight of <br /> Implementation Implementation Implementation <br /> AIR QUALITY <br /> The generation of dust Mitigation Measure AIR-1: The proposed project includes the During all phases Project applicant City's Building <br /> and other particulate following construction practices to reduce construction dust/air of construction. and contractors Official <br /> matter could during all phases <br /> quality impacts to a less than significant levei: <br /> temporarily impact . All exposed surfaces(e.g. parking areas, staging areas, of construction <br /> nearby sensitive <br /> receptors. soil piles, graded areas, and unpaved access roads)shall <br /> be watered two times per day. <br /> • All haul trucks transporting soil, sand, or other loose <br /> mate�ial offsite shall be covered. <br /> • All visible mud or dirt track-out onto adjacent public <br /> roads shall be removed using wet power vacuum street <br /> sweepers at least once per day. The use of dry power <br /> sweeping is prohibited. <br /> • Sweep daily(with water sweepers)all paved access roads, <br /> parking areas and staging areas at construction sites. <br /> • All vehicle speeds on unpaved roads shall be limited to 15 <br /> mph. <br /> • All roadways, driveways, and sidewalks to be paved shall <br /> be completed as soon as possible. <br /> • Building pads shall be laid as soon as possible after <br /> grading unless seeding or soil binders are used. <br /> • Idling times shall be minimized either by shuttir�g <br /> equipment off when not in use or reducing the maximum <br /> idling time to five minutes(as required by the California <br /> airborne toxics control measure Title 13, Section 2485 of <br /> California Code Regulations [CCR]). Clear signage shall <br /> be provided for construction workers at all access points. <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page 16 <br /> RESO.#15217 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.