My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res12 15217
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res12 15217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:47:45 AM
Creation date
10/11/2019 7:47:39 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYINGTHE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT; ADOPTING CEQA FINDINGS, AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
osn oi2o�2 <br /> Construction Mitigation Measure HAZ-2: The primary contractor responsible The safety plan Project applicant City's Building <br /> activities would shall be approved and primary Official <br /> include the temporary for construction shall prepare a safety plan. The safety plan shall prior to the start contractor <br /> and short-term include measures to reduce and minimize accidents on-site of construction <br /> transport and activity on the <br /> (housekeeping), and measures that address the proper procedures <br /> handling of various site and <br /> construction materials to clean up and contain spills. The safety plan shall be approved implemented <br /> that are classified as by the City's Building Department prior to the start of during all <br /> hazardous materials construction activity on the site. construction <br /> (e.g., diesel fuel, oil, activity <br /> gasoline, and Less Than Significant Impact with Mitigation <br /> architectural <br /> coatings). <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT <br /> Responsibility <br /> Impact Mitigation Timeframe for for Oversight of <br /> Implementation Implementation Implementation <br /> NOISE <br /> Noise generating During all phases Project applicant Director of <br /> Mitigation Measure NOI-1: <br /> activities associated of construction and contractors Planning <br /> with demolition and a. Limit construction to daytime hours (7:00 AM to 8:00 during all phases <br /> construction at the PM)Monday through Friday, with no construction of construction <br /> project site would activities on weekends or holidays per Section 24.32 of <br /> tempararily elevate the City of Redwood City Municipal Code. <br /> noise levels in the area <br /> surrounding the b. Construction activities or equipment shall not generate <br /> project site. <br /> noise levels exceeding 110 dB(A)per Sec. 24.31 of the <br /> City of Redwood City Municipal Code. <br /> c. Utilize"quiet" models of air compressors and other <br /> stationary noise sources where technology exists. <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page 19 <br /> RESO.#15217 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.