My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res12 15219
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res12 15219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:47:51 AM
Creation date
10/11/2019 7:47:48 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING A VESTING TENTATIVE MAP PURSUANT TO THE SUBDIVISION MAP ACT AND THE REDWOOD CITY MUNICIPAL CODE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/10/2012 <br /> Additionally, the plan shall include specific provisions for the protection of the <br /> creek from erosion, sediment, and construction debris. All construction work <br /> in connection with this Project must conform to the approved Erosion and <br /> Sediment Control Plan. <br /> 39.Prior to commencing any work on the Project, including demolition or grading <br /> work, the applicant shall post at all entries to the Project site in clear view of <br /> the public right-of-way, a sign as required by RCMC Section 24.33 indicating <br /> the hours of construction and limitations on construction noise. Additionally, <br /> the sign shall include a phone number of the applicant's designated contact <br /> for complaints about problems with the construction activity. <br /> 40.Applicant shall be responsible for the cost of repairs to any improvements <br /> within the public right-of-way that are damaged during construction. The <br /> applicant shall submit documentation of the existing condition of Finger <br /> Avenue from the westerly extent of the Project site to the intersection of <br /> Finger Avenue and EI Camino Real and the public improvements along the <br /> Project's frontage, including but not limited to trees, tree grates, signs, light <br /> poles, drainage inlets, curbs, gutters, etc. to the satisfaction of the City <br /> Engineer prior to issuance of a grading or building permit. This survey shall <br /> be submitted to the City Engineer for review and approval. All damage shall <br /> be repaired to the satisfaction of the City Engineer at no cost to the City prior <br /> to the release of subdivision securities. Notwithstanding for the foregoing, all <br /> damage that is a threat to public health or safety, as determined by the City <br /> Engineer, shall be repaired immediately. <br /> 41.No materials or equipment shall be stored on the improved portion of any <br /> public roadway at any time. <br /> 42.Prior to the end of each work day during construction, the contractor or <br /> contractors shall pick up and properly dispose of all litter resulting from or <br /> related to the Project, whether located on the property, within the public <br /> rights-of-way, or properties of adjacent or nearby neighbors. <br /> 43.The Project is subject to the impact fees which were in effect and applicable <br /> to the Project when the Vesting Tentative Map is submitted and found <br /> complete which include but are not limited to: traffic impact fees, school fees, <br /> water treatment fees, sewer fees, and parkland in-lieu fees. All such fees <br /> shall be paid at the time of issuance of building permits. The amount of the <br /> impact fees shall be determined at the time of payment in accordance with <br /> the fee schedule or method of calculation then in effect. <br /> 44.A11 of the conditions of approval shall be reproduced on the first page of the <br /> plans submitted for demolition, grading or building permits. Additional pages <br /> may be used if necessary. At least one (1) copy of the stamped approved <br /> ATTY/RES0.2785/FINGER RESO APPROVING VTM FINAL RESO.#15219 <br /> REV:08-31012 VR MUFF#613 <br /> Page 16 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.