Laserfiche WebLink
12/03/20 <br /> EXHIBIT "C" <br /> SCHEDULE OF HOME iMPROVEMENTS <br /> Nofe: The foIlowing renovation projects have already been completed by the current owners <br /> during the 2090-2012 period: replacemenf af 153 seafs in the mezzanine ba/cony, upgrade of <br /> the electrica!system, the addition of fire sprinklers, and the addition of archifectural lighting. <br /> YEAR lMPROVEMENT <br /> 2013 Replace 321 fixed seats on orchestra fioor <br /> 2014 Replace lobby carpet <br /> 2015 Replace flaoring of orchestra pit <br /> 2017 Improve stainless steel disp(ay cases <br /> Have spire evaluated by a structural engineer <br /> 2018 Restore and replace the spire as necessary based on the structural enginesr's <br /> evaluation <br /> 2019 Paint side and back of building <br /> 2020 Touch up facade paint as needed <br /> 2021 Update eEectrical power to marquee <br /> 2022 Replace 500 upper baicony seats <br /> ATTYlAGRl2�12.1841FOX THEATRE MILLS ACT CONTRACT <br /> REV:11-15-12 VR <br /> Page 9 of 10 <br /> RESO. # 15235 <br /> MUFF#612 <br />