My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> Information), which are hereby incorporated by reference. <br /> Impact: Impact 8-2: Operational Emissions Increases. Project development would <br /> generate stationary, area, and traffic air pollutant emissions increases. These <br /> emissions would not subject sensitive receptors to substantial pollutant <br /> concentrations, but emissions of ROG and PM,o would exceed BAAQMD <br /> significance thresholds. <br /> Mitigation: Mitigation 8-2. In addition to the project-proposed sustainability measures <br /> described in chapter 3 (Project Description) of the Draft EIR, which include a <br /> Transportation Demand Management (TDM) program, implement the following <br /> measure: <br /> Minimize testing of the new generators to reduce ROG emissions. New generator <br /> emissions, as computed on an annual basis, shall be reduced by 30 percent or <br /> greater. This could be achieved in a number of ways: <br /> 1. Install fewer than the assumed 13 new generators; <br /> 2. Install generators with lower emissions (in this case, smaller generators); <br /> 3. Test new generators at lower running loads (the analysis assumed 100- <br /> percent load, so 50-percent load would reduce emissions); and/or <br /> 4. Reduce the number of annual testing hours. <br /> The applicant shall submit an analysis of the new generator emissions prior to <br /> installing more than five new generators at the project development site. <br /> Finding: Implementation of Mitigation 8-2 would reduce ROG emissions by 2.7 pounds <br /> per day, resulting in total ROG emissions of 53.1 pounds per day (below the <br /> BAAQMD significance threshold of 54 pounds per day), a less-than-significant <br /> impact. However, this mitigation measure would reduce PM,o emissions by a <br /> minimal amount, leaving PM�o emissions above the BAAQMD significance <br /> threshold and resulting in a significant unavoidable project and cumulative <br /> operational air quality impact. <br /> Facts in Support of Finding: In combination with the project-proposed TDM program, <br /> implementation of Mitigation 8-2 would reduce the project's operational ROG <br /> emissions to a less-than-significant level by minimizing generator testing. <br /> However, even with all feasible mitigation, operational PM,o emissions would <br /> exceed the BAAQMD threshold, due mainly to overall traffic generated by full <br /> buildout of the project, resulting in a significant unavoidable project and <br /> cumulative operational air quality impact. These facts are described and <br /> quantified in Draft EIR chapter 8 (Air Quality) on pages 8-1 through 8-28, Draft <br /> EIR appendix 21.4 (Supplemental Air Quality and Climate Change Information), <br /> and Final EIR appendix B (Supplemental Bay Area Air Quality Management <br /> District [BAAQMDj Information), which are hereby incorporated by reference. <br /> ATTY/RES0.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page ii of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.