My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> Impact: Impact 7-18: Cumulative With Project Impact on Marsh Road/Scott Drive <br /> Intersection. Under Cumulative With Project conditions during the PM peak <br /> hour, the intersection, would remain at LOS F and the proposed project could <br /> contribute up to 14.4 seconds of delay. The intersection of Marsh Road/Scott <br /> Drive is located in the City of Menlo Park. <br /> Mitigation: Mitigation 7-18. To mitigate the cumulative impact at the intersection of Marsh <br /> Road and Scott Drive, the eastbound approach of Scott Drive would need to be <br /> restriped to include a total of one shared through/left-turn lane and one right-turn <br /> lane. (Marsh Road is considered north-south and Scott Drive is considered east- <br /> west.) With these improvements, the level of service (LOS) at this intersection <br /> would remain an unacceptable LOS F during the PM peak hour. Although the <br /> LOS F still exceeds the City of Menlo Park LOS standard, the LOS under <br /> Cumulative With Project conditions would be better than that under Cumulative <br /> No Project conditions. <br /> Traffic from the proposed project could contribute up to 14.4 seconds to the PM <br /> delay at this intersection over Cumulative No Project conditions (see Draft EIR <br /> Table 7.16); other Cumulative growth could add up to 74.4 seconds to the delay <br /> over Near Term No Project conditions. The proposed project would contribute its <br /> fair share to a mitigation fund established to pay for the cost of this improvement <br /> (estimated, based on the Draft EIR, to be 16 percent) at the time of issuance of a <br /> building permit or, if the City adds the improvements to its Traffic Impact Fee <br /> Program (TIF) project list, the proposed project would pay its Traffic Impact Fee <br /> in effect at time of payment and issuance of a building permit. <br /> Finding: Implementation of Mitigation 7-18 would reduce the project's contribution to this <br /> cumulative impact to a less-than-significant level. However, because this <br /> improvement would require City of Menlo Park approval, the City of Redwood <br /> City cannot ensure the construction of this improvement. Without implementation <br /> of the proposed mitigation, the impact would be significant and unavoidable. <br /> Facts in Support of Finding: Implementation of Mitigation 7-18 would reduce the project's <br /> contribution to the cumulative traffic impact at the Marsh Road/Scott Drive <br /> intersection to a less-than-significant level through the project's payment of its <br /> fair share (estimated to be 16 percent) to a mitigation fund, or if in effect at <br /> building permit issuance, through payment of its City Traffic Impact Fee, to <br /> restripe the intersection. However, the City cannot guarantee in advance that the <br /> City of Menlo Park will approve the mitigation, so the impact is currently <br /> considered significant and unavoidable. These facts are described in Draft EIR <br /> chapter 7 (Transportation, Circulation, and Parking) on pages 7-1 through 7-70, <br /> Draft EIR appendix 21.3 (Supplemental Transportation Information), and Final <br /> EIR appendix A (Supplemental Traffic Information), which are hereby <br /> incorporated by reference. <br /> Impact: Impact 7-19: Cumulative With Project Impacts on Freeway Segments. <br /> Traffic generated by the proposed project is expected to result in the following <br /> freeway segment operational effects: <br /> ATTY/RE50.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 40 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.