My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> • Policy BE-41.3 (minimized groundwater infiltration and inflow) <br /> • Goal BE-32 (diverse and healthy economy) <br /> Jobs <br /> Implementation of the Project will generate temporary construction jobs and will bring <br /> additional employees to Redwood City, which the City finds will promote and enhance a healthy <br /> and diverse economy in the City. <br /> Environmental Benefits <br /> Implementation of the Project will provide for extension of recycled water service to the <br /> site, replacement of all existing inefficient plumbing fixtures, contribution to the Main City <br /> Service Area emergency water storage tank program, replacement of on-site vitreous clay <br /> wastewater pipelines that are subject to inflow and infiltration, reduction of impervious surfaces <br /> on the site, flood-proofing of buildings, and storage of storm water in open space and greenway <br /> areas rather than on parking lots. In addition, implementation of the Project will provide 2.4 <br /> acres of publicly accessible open space; replace older buildings with new buildings constructed <br /> to meet the latest seismic and engineering standards; and improve the visual character and <br /> quality of the Project development site, including creating a more coherent form, scale, and <br /> character within the Precise Plan area. The Project includes a Neighborhood Streets <br /> Enhancement Program to enhance residenYs enjoyment of their streets, sidewalks, and <br /> neighborhoods. <br /> Flexibility and Definitiveness <br /> Implementation of the Project will provide flexible building forms to allow for long-term <br /> tenanting and re-tenanting by office, research and development (R&D), medical clinic, and other <br /> potential uses. The Plan's policy envelope for development intensity, building heights and <br /> orientation, architectural design, circulation, parking, and other components is intended to be <br /> flexible enough to allow for changing conditions, but definitive enough to ensure that the City's <br /> vision for the Precise Plan area is achieved. <br /> ATTY/RES0.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 55 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.