My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> uses developed during earlier phases of conventional construction-period noise <br /> Precise Plan buildout. Because construction abatement measures: <br /> noise could elevate noise levels at the <br /> nearest residences by more than 5 dBA,at • Construction Plan. Prepare a detailed <br /> some locations the proposed project could construction plan identifying the <br /> cause a potentiallysignii►cant interrnittent schedule for major noise-generating <br /> and short-term impact. construction activities. The <br /> construction plan shall identify a <br /> procedure for coordination with nearby <br /> existing and on-site newly constructed <br /> noise-sensitive facilities so that <br /> construction activities can be <br /> scheduled to minimize noise <br /> disturbance. <br /> • Construction Scheduling. Ensure that <br /> noise-generating construction activity is <br /> limited to between the hours of 7:00 <br /> AM to 8:00 PM,Monday through <br /> Friday,and prohibit any construction <br /> during other hours which would cause <br /> any increase in ambient noise levels <br /> within a residential district. (Redwood <br /> City Municipal Code Section 24.32) <br /> • Construction Equipment Mufflers and <br /> Maintenance. Equip all internal <br /> combustion engine-driven equipment <br /> with intake and exhaust mufflers that <br /> are in good condition and appropriate <br /> for the equipment. <br /> • Equipment Locations. Locate <br /> stationary noise-generating equipment <br /> as far as possible from sensitive <br /> receptors when sensitive receptors <br /> adjoin or are near the construction site. <br /> • Construction Traffic. Route all <br /> construction traffic to and from the <br /> construction sites via designated truck <br /> routes where possible. Prohibit <br /> construction-related heavy truck traffic <br /> in residential areas where feasible. <br /> • Quiet Equipment Selection. Use quiet <br /> construction equipment, particularly air <br /> compressors,wherever possible. <br /> Page 27 27 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.