My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15303
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:44 AM
Creation date
10/11/2019 7:50:41 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
11/4/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING AMENDMENT NO. ONE (1) TO THE FRANCHISE AGREEMENT WITH RECOLOGY SAN MATEO COUNTY FOR RECYCLABLE MATERIALS, ORGANIC MATERIALS AND SOLID WASTE COLLECTION SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11/04/2013 <br /> ATTACHMENT I <br /> PERFORMANCE INCENTIVES AND DISINCENTIVES <br /> Exceptional Diversion Level Performance <br /> For Rate Years Two (2012) through Ten (2020) Contractor shall receive an incentive <br /> payment if the calculated Overall Diversion Level achieved by Contractor in any given <br /> Rate Year exceeds (i) the highest calculated Overall Diversion Level achieved by <br /> Contractor in a prior Rate Year during the Term or (ii) the Overall Diversion Level <br /> achieved by Previous Contractor in 2010 which shall include all Recyclable Materials <br /> Collected by Contractor during the Recycling Blitz. <br /> For example: <br /> • If the Previous Contractor achieves an Overall Diversion Level of 36.45% <br /> (including all Recyclable Materials Collected by Contractor during the Recycling <br /> Blitz) in 2010 and Contractor achieves an Overall Diversion Level of 35.58% in <br /> Rate Year One, the Contractor must achieve an Overall Diversion Level greater <br /> than 36.45% in any given Rate Year to receive an incentive payment. <br /> • If Contractor achieves Overall Diversion Levels for Rate Years Two, Three, Four <br /> and Five of 37.66%, 38.59%, 38.38% and 37.64%, respectively, Contractor shall <br /> receive an incentive payment for Rate Year Three only and the Overall Diversion <br /> Level that must be exceeded is 38.59% in future Rate Years, unless a higher <br /> Overall Diversion Level is achieved. <br /> The targeted Overall Diversion Level shall be calculated based on the methodology used <br /> in the following example: <br /> Example assumptions (actual results will be based on Contractor performance): <br /> 6 RESO.#15303 <br /> MUFF#01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.