My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15305
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:59 AM
Creation date
10/11/2019 7:50:44 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Special
Agency Type
City Council
Date
11/18/2013
Description
RESOLUTION DENYING THE APPEAL BY 605 MIDDLEFIELD ROAD LLC, AND MODIFYING THE SEPTEMBER 3, 2013 PLANNING COMMISSION ACTIONS, TO APPROVE THE TENTATIVE MAP, CONDOMINIUM PERMIT, PLANNED DEVELOPMENT PERMIT AND PLANNED COMMUNITY PERMIT, THE 525 MIDDLEFIELD ROAD PROJECT AS REVISED ON NOVEMBER 8, 2013, ALL PURSUANT TO THE CITY OF REDWOOD CITY'S DOWNTOWN PRECISE PLAN AND SUBDIVISION ORDINANCE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11/18/2013 <br /> requirements of NFPA Standard 14 is required as part of this Project. <br /> 38. The installation of a firefighter communication system meeting the <br /> requirements of the Redwood City Fire Code is required as a part of this Project. A <br /> full automatic fire alarm system is also required under the State Fire Code. <br /> 39. Red curb paint and "No Parking" signage shall be installed by the <br /> applicant as a part of this project at certain locations upon confirmation of Fire <br /> Department connections and fire hydrants. <br /> 40. Applicant shall comply with all City, State and Federal regulations, <br /> applicable to the Project, related to: fire and life safety, ADA requirements, and all <br /> general building code regulations as per the State Building Code as adopted and <br /> amended by the City of Redwood City. <br /> 41. The applicant shall retain a Civil Engineer to prepare "as-built" or <br /> record" drawings, and the drawings shall be submitted in AutoCad format. <br /> 42. All internal garage drains shall be plumbed to the sanitary sewer, not the <br /> storm drain. <br /> 43. If the semi-subterranean garage will necessitate groundwater pumping <br /> into the sewer system, a Discharge fee will apply and a Discharge Permit will be <br /> required by South Bayside System Authority (SBSA) and the City of Redwood City. <br /> 44. Parking garage ramps shall be designed in conformance with Volume I II <br /> of the Engineering Standards, and shall consider safety and visibility of pedestrians <br /> to the satisfaction of the City Engineer. Furthermore, if the modified parking garage <br /> entrances conflict with any surface or subsurface utilities the Applicant shall relocate <br /> the utilities to be outside of the drive aisle. <br /> 45. Prior to removing any public parking spaces from public use during <br /> construction, where applicable, the applicant shall apply for Parking Meter Construction <br /> Zone Hoods per Municipal Code sections 20.175 through 20.183. Parking meter <br /> construction zone hoods shall be issued upon payment of a deposit of ten dollars <br /> ($10.00) per hood issued, refundable upon return of the hoods, and a nonrefundable <br /> fee of three dollars ($3.00) per day per hood issued. For those parking meters that <br /> will be temporarily removed during construction, the applicant shall be required to <br /> replace them after project completion, per the direction of the City Engineer. <br /> 46. Prior to Final Map approval, the applicant shall provide a shared <br /> parking covenant (in a form acceptable to the Community Development Director and <br /> the City Attorney) providing the City with assurance that the shared parking <br /> obligations under the Downtown Precise Plan with respect to the project will be met <br /> and to assure that public parking supporting the downtown businesses will be <br /> provided for the commercial component of the project, at a minimum Monday <br /> ATTY/RES0.2925/APPEAL OF 525 MIDDLEFIELD RESO. #15305 <br /> REV:11-13-13 VR MUFF#603 <br /> Page 11 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.