My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res14 15325
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res14 15325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:51:21 AM
Creation date
10/11/2019 7:51:19 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
2/10/2014
Description
RESOLUTION OF THE COUNCIL OF THE CITY OF REDWOOD CITY APPROVING AND AUTHORIZING EXECUTION OF SUPPLEMENTAL AGREEMENT VI TO JOINT EXERCISE OF POWERS AGREEMENT FOR THE SOUTH BAYSIDE SYSTEM AUTHORITY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A to Supplemental Agreement VI <br /> SOUTH BAYSIDE SYSTEM AUTHORITY <br /> EXHIBIT A <br /> A. DISTRIBUTION OF CAPITAL COSTS FOR STAGE ONE OF THE PROJECT <br /> Belmont San Carlos Redwood Citv Menlo Park <br /> 1. Menlo Park Pumping Plant& <br /> Force Main to Redwood City 0.0 0.0 0.0 100.0 <br /> 2. San Carlos Outfall from Existing <br /> Pumping Plant to New <br /> Pumping Plant 0.0 100.0 0.0 0.0 <br /> 3. New FM Booster Station and <br /> San Carlos Pumping Plant 0.0 40.0 0.0 60.0 <br /> 4. Redwood City Meter& <br /> Pumping Plant Modifications 0.0 0.0 100A 0.0 <br /> 5. Harbor Industrial S.M.D. <br /> Metering Facilities 0.0 100.0 0.0 0.0 <br /> 6. Belmont Standby Power,Pumping <br /> Plant Modifications&Force Main <br /> Connection 100.0 0.0 0.0 0.0 <br /> 7. Subregional Treatment Plant <br /> at Redwood Shores 8.8 13.8 53.7 23.7 <br /> Notes: <br /> 1. Capital costs above include readily identifiable costs of construction, including <br /> engineering design, construction supervision and change orders during construction. Costs <br /> of special services, including soils studies, surveys, rights-of-way, legal and administrative <br /> expenses and preliminary engineering(including reports)are not included. <br /> 2. Costs of special services described in Note 1 above shall be distributed in accordance with <br /> each Agency's percentage of the total costs of constructing all of Stage 1 of the Project. In <br /> equation form this would be as follows: <br /> Agency percentage of special services costs=A�encv Capital Costs <br /> Total Costs of Stage 1 of Project <br /> 3. The percentages set forth above are based on actual costs, exclusive of any State and/or <br /> Federal grants received. Should any such grants be received prior to, during, or after the <br /> completion of construction, they shall be returned to each of the Agencies, in accordance <br /> with the rules and regulations which govern at the time of receipt of such grants. <br /> 4. Capital costs above are based on the assignment of 40% to Flow and 30% to BOD and <br /> 30%to Suspended Solids and the Maximum Capacity Rights(Section 7.2). <br /> 12 <br /> SBSA_J PASuppVl_052212r_120412rforsig] <br />
The URL can be used to link to this page
Your browser does not support the video tag.