My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res14 15325
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res14 15325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:51:21 AM
Creation date
10/11/2019 7:51:19 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
2/10/2014
Description
RESOLUTION OF THE COUNCIL OF THE CITY OF REDWOOD CITY APPROVING AND AUTHORIZING EXECUTION OF SUPPLEMENTAL AGREEMENT VI TO JOINT EXERCISE OF POWERS AGREEMENT FOR THE SOUTH BAYSIDE SYSTEM AUTHORITY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
connection fees as aforesaid. Subsequent increments have been or shall be <br /> constructed in sequence; provided, however, that no such increment shall be <br /> constructed unless and until sufficient funds therefor have been received by the <br /> Authority. Reimbursement for the costs of construction of the first increment and <br /> advance payments for such costs for each subsequent increment shall be made <br /> by each of the Agencies in their respective allocated shares corresponding to their <br /> respective maximum treatment capacity rights determined as provided in <br /> Subdivisions (b) of Sections 5.9 and 7.2. Funds remaining after completion of <br /> construction of the final increment of Stage 2 of the Project shall be returned to the <br /> Agencies in proportion to their respective contributions. <br /> The Commission shall determine the connection fee to be charged by the <br /> Agencies for financing the construction of Stage 2 of the Project based upon a <br /> cost-pricing method under which the users of the treatment capacity constructed <br /> and established by Stage 2 of the Project shall be assessed the cost of <br /> construction thereof. The fee as established by the Commission shall be based <br /> upon the estimated total cost of construction (including provision for cash flow <br /> requirements and fees and costs of related necessary services) of the entire <br /> Stage 2 of the Project, notwithstanding that said Stage 2 shall be constructed in <br /> increments. Said fee shall be expressed in dollars per gallon per day volume of <br /> wastewater treatment capacity. <br /> The Authority shall notify each Agency of the amount of said fee, and each <br /> such agency shall, and does hereby agree to, implement and charge such fee in <br /> its wastewater connection fee system such that that portion of the wastewater <br /> connection fee (howsoever designated by the Agencies, respectively) charged, <br /> assessed or otherwise collected by said Agencies which provide for the cost of <br /> construction of Stage 2 of the Project shall be uniform amongst all of said <br /> Agencies. Not less than annually the Commission shall review said fee and make <br /> such adjustments thereto as are necessary or appropriate to reflect current and <br /> projected estimates of the cost of construction of Stage 2 of the Project. <br /> Thereupon, the Authority shall advise each Agency of the adjusted fee, and each <br /> such Agency shall, and does hereby agree to, implement and charge such <br /> adjusted fee in its wastewater connection fee system as aforesaid. The Agencies <br /> 5 <br /> SBSA_J PASuppVl_052212r_120412rtorsig] <br />
The URL can be used to link to this page
Your browser does not support the video tag.