My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res14 15325
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res14 15325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:51:21 AM
Creation date
10/11/2019 7:51:19 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
2/10/2014
Description
RESOLUTION OF THE COUNCIL OF THE CITY OF REDWOOD CITY APPROVING AND AUTHORIZING EXECUTION OF SUPPLEMENTAL AGREEMENT VI TO JOINT EXERCISE OF POWERS AGREEMENT FOR THE SOUTH BAYSIDE SYSTEM AUTHORITY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
by it and for prior contributions of Capital Costs and costs of Special Services for <br /> the Joint Facilities paid by it, in determining the allocation of the costs of <br /> construction of Stage 1 of the Project. . <br /> (b) Capital Costs of Staqe 2 of the Project. The Capital Costs of Stage 2 of <br /> the Project shall be and have been allocated to the respective Agencies based <br /> upon each such Agency's aggregate payments for the financing of each increment <br /> thereof corresponding to the maximum capacity rights of each Agency as <br /> determined pursuant to subdivision (b) of Section 7.2. <br /> (c) Subseauent Capital Costs. Capital Costs for the reconstruction, <br /> replacement, rehabilitation, remodeling, relocation and repair of Stage 1 and <br /> Stage 2 of the Project or any component thereof or addition thereto, shall be <br /> allocated among the Agencies based upon the percentage that the sum of their <br /> respective Stage 1 and Stage 2 shares of capacity rights comprises of the total <br /> capacity rights of Stages 1 and 2, expressed in gallons per day volume of Average <br /> Daily Dry Weather Flow as set forth in Subdivision B of Exhibit A." <br /> 6. Section 7.2 of the Agreement is hereby amended to read as follows: <br /> "Section 7.2.Maximum Capacitv Riphts. <br /> (a) Maximum Capacity Riqhts for Stage 1 of the Project. The maximum <br /> respective capacity rights of the Agencies to the treatment capacity of Stage 1 of <br /> the Project are: <br /> Average <br /> Peak Wet Daily Dry <br /> Weather Weather Biochemical Suspended <br /> Flow Flow Oxygen Demand Solids <br /> Agency (in mgd) (in mgd) (Ibs. per day) (Ibs. per day) <br /> Belmont 8.8 2.3 5,204 5,678 <br /> Redwood City 30.5* 11.4 38,727 36,510 <br /> San Carlos 14.3 3.7 6,982 9,954 <br /> West Bay 14.4 6_6 14.137 13,308 <br /> Total 68.0 24.0 65,050 65,450 <br /> *Peak Wet Weather Flow for Redwood City specified is for capacity rights in the treatment plant; <br /> Redwood City's Peak Wet Weather Flow capacity includes capacity in the subregional conveyance <br /> facilities of 25.9 mgd plus the additional flow of 4.6 mgd in the Redwood Shores force main. <br /> (b) Maximum Capacifir Riqhts for Staqe 2 of the Proiect. The maximum <br /> 7 <br /> SBSA_J PASuppVl_052212r_120412rforsig] <br />
The URL can be used to link to this page
Your browser does not support the video tag.