My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res15 15431
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res15 15431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:53:14 AM
Creation date
10/11/2019 7:53:11 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/27/2015
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING A TENTATIVE PARCEL MAP, DOWNTOWN PLANNED COMMUNITY PERMIT, AND PARKING IN-LIEU FEE FOR 815 HAMILTON STREET, 2215 BROADWAY, AND 840 MIDDLEFIELD ROAD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
07/27/2015 <br /> filing. All tree removal and trimming shall take place outside of the breeding season. <br /> [COA][PLANNING] <br /> 24. Tree Removal Permit - The applicant shall obtain a Tree Removal Permit application <br /> to the City's Landscape Architect for review and approval prior to the removal any trees <br /> on the subject property or along the Project's three street frontages. Sf DRl[PLANNING] <br /> 25. Stormwater Runoff- Post-construction runoff into the storm drain shall not exceed pre- <br /> construction runoff levels. The applicant's design professional shall evaluate the <br /> project's impact to the City's storm drainage system and shall substantiate their <br /> conclusions with drainage calculations to the satisfaction of the City Engineer. The <br /> project shall be designed in conformance with the Drainage Guidelines for Commercial <br /> Development. [SDR][ENGINEERING] <br /> 26. Exterior Lighting — New exterior lighting requires final review by the City prior to <br /> building permit issuance. As part of the Building Permit submittal package, the applicant <br /> shall provide a lighting plan including cut-sheets for all new fixtures, as well as <br /> photometric evaluation site plan demonstrating that light levels are appropriate for the <br /> use and that the new light sources do not introduce glare or light effects that spill off the <br /> property. [COA][PLANNING] <br /> 27. Bicycle Parking — The amount of required, long-term bicycle parking shall be <br /> determined by the amount of required vehicle parking (regardless of whether it is <br /> provided on site or via payment of the in-lieu fee) for the project. Up to 20% of the <br /> required spaces may be provided on the adjacent sidewalk for use as short-term bicycle <br /> parking. The remainder must be provided onsite, in a secure location for long-term <br /> parking. [COA][ENGINEERING] <br /> 28. Outdoor Structures and Uses —Any outdoor structures or uses not identified with this <br /> project require separate review and approval by the City prior to installation of structures <br /> or commencements of uses. The outdoor tables, chairs, umbrellas and other outdoor <br /> structures in the right-of-way have been reviewed by the City in concept only and require <br /> further review. Prior to the installation of any outdoor structures or commencement of <br /> uses in the right-of-way, the applicant shall submit detailed plan to the City. A Sidewalk <br /> Cafe Permit may be required for outdoor dining uses. [SDR][PLANNING] <br /> Parcel Map <br /> 29. Applicable Codes—The applicant shall adhere to the Subdivision Map Act and Chapter <br /> 30 of the City's Municipal Code. <br /> 30. Right-of-Way (ROW) Vacation - The proposed ROW Vacation of the Sliver Parcel on <br /> Winslow Street shall be completed prior to the approval of the Final Map. <br /> 31. Parcel Map - Prior to Building Permit issuance, a Parcel Map for the property shall be <br /> recorded. The Parcel Map shall include the merging of all the lots into one lot, and shall <br /> include any proposed easements. SDR [ENGINEERING] <br /> 32. Agreements - Prior to Parcel Map approval, the applicant shall enter into the following <br /> agreements in a form acceptable to the City Attorney: [COA][ENGINEERING] <br /> Page 8 of 20 <br /> ATTY/RES0.3115/CC RESO APPROVING TM,DPC,PARKING IN-LEU RESO.#15431 <br /> REV:07-17-15 VR MUFF#609 <br />
The URL can be used to link to this page
Your browser does not support the video tag.