My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res15 15433
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res15 15433
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:53:15 AM
Creation date
10/11/2019 7:53:14 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/27/2015
Description
A RESOLUTION APPROVING AND ADOPTING TRAFFIC IMPACT MITIGATION FEE PROJECT DESCRIPTIONS AND COST ESTIMATES AND APPROVING THE TRANSPORTATION IMPACT FEE SCHEDULE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
07/27/2015 <br /> # Project Description Total Cost' <br /> Veterans Boulevard/ 1)Add WB(Woodside)right turn overlap <br /> 18 Woodside Road 2)Add a shared left-through lane on SB Veterans and a second $70,000 <br /> receiving lane on US 101 on-ramp <br /> 19 Doggla Avenue Install traffic signal with left-turn lanes on NB and SB Bay Road 2 $300,000 <br /> 20 Middlefield Road/ provide protected phasing for NB and SB Middlefield Road $100,000 <br /> Douglas Avenue <br /> 21 Second A enue Install traffic signal2 $300,000 <br /> 22 Blomquist StreeU Install signal and provide dedicated left-turn lanesZ $300,000 <br /> Maple Street <br /> Blomquist StreeU 1)Add second NB(E.Bayshore)left and restripe the existing <br /> 23 Seaport Boulevard shared through/left lane as a dedicated through lane. $600,000 <br /> 2)Add second dedicated SB(Blomquist)left turn. <br /> 24• Various intersections(four Install lighted pedestrian crossings $82,000 <br /> locations) <br /> Corridor�npro+�►nents <br /> 25' Blomquist Road Extension Extend to East Bayshore,bridge Redwood Creek $9,700,000 <br /> 26' East Bayshore Road Widen south of Whipple $890,000 <br /> 27' Veterans Boulevard Widen to 4 lanes between Chestnut and Woodside $360,000 <br /> 28, Woodside Road median closures(2) $20,000 <br /> {EI Camino to Valota) <br /> 29 US 101/Woodside Road Interchange improvements $3,000,000 <br /> /Seaport Boulevard Interchange (engineering studies and preliminary design) <br /> 30 Middlefield Road Pedestrian streetscape improvements $2,300,006 <br /> (Woodside to Main) <br /> �lt@►lfll pfOVB/pAllfS <br /> 31, Neighborhood Traffic Alleviate cut-through traffic and speeding in various neighborhoods $1,220,000 <br /> Management Programs <br /> New class I, Ii,and III bicycle facilities per the 2010 General Plan <br /> 32 Bicycle Network (See Appendix A regarding specific improvements included) $9,020,000 <br /> • Middlefield Rd between Flynn Ave and Douglas Ave: Modify $46,000 <br /> to 3 lanes plus bike lanes <br /> • Jefferson Ave between Clinton St and Farm Hill Blvd: Modify $407,000 <br /> to 3 lanes plus bike lanes <br /> . Implement"Complete StreeY' <br /> 33 improvements per the 2010 • Broadway between Maple and Chestnut Streets: Modify to 3 $85� <br /> General Plan lanes plus bike lanes <br /> • Broadway between Charter St and a quarter-mile east of $�00,000 <br /> Douglas Avenue: Modify to 3 lanes plus bike lanes <br /> • Farm Hill Blvd between Jefferson Ave and I-280: Modify to 2 $413,000 <br /> lanes where there is a median and 3 lanes where no median <br /> /ATTY/RE503118/CC RESO APPROVING AND ADOPTING RESO.#15433 <br /> TRAFFIC IMPACT MITIGATION FEES/TRANSPORTATION IMPACT FEE SCHEDULE MUFF#402 <br /> REV:07-23-15 PT <br /> Page 8 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.