Laserfiche WebLink
09/21/2015 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT <br /> Im act Timeframe for Responsibility <br /> P Mitigation for Oversight of <br /> Implementation Implementation <br /> Implementation <br /> HYDROLOGY AND WATER QUALITY <br /> The project would Mitigation Measure HYD-5: The project developer shall Prior to submittal Project applicant Director of <br /> increase the amount implement a stormwater drainage plan during construction and of a grading and contractors Planning and City <br /> of impervious post-construction,approved by the City in conformance with permit to the City during all phases Engineer <br /> surfaces on the applicable state and federal requirements. Prior to submittal of a Engineer for of construction, <br /> project site,thereby grading permit to the City Engineer for review and approval,or review and and post- Regional Water <br /> increasing the amount such other site improvement permit that is a requisite prior to the approval,or such construction Qualiry Control <br /> of urban runoff. start of project site grading,the applicant shall prepare a other site measures shall be Board <br /> Stormwater Pollution Prevention Plan(SWPPP)that is consistent improvement the responsibiliry <br /> with applicable requirements and regulations.The SWPPP shall permit that is a ofthe <br /> be approved by the City Engineer concurrent with the approval of requisite prior to Home��wners <br /> a grading permit,or such other site improvement permit that is a the start of project Association <br /> requisite prior to the start of project site grading. site grading <br /> Less Than Significant Impact with Mitigation <br /> The project would Mitigation Measure HYD-6: The project shall install a Prior to Project applicant City Engineer <br /> create or contribute stormwater treatment system so that runoff would be filtered over recordation of the shall enter into <br /> runoff water which a minimum of twenry-five(25)feet of vegetation or through other final map an Operation <br /> has the potential to equivalent means and will not degrade water quality before and <br /> provide substantial discharging into the City storm drain system and eventually Maintenance <br /> additional sources of Cordilleras Creek. Prior to recardation of the final map,the Agreement with <br /> polluted runoffor that applicant shall enter into an Operation and Maintenance the City.Long- <br /> could substantially Agreement,and provide a maintenance plan,with the City to term,the post- <br /> alter the existing ensure the ongoing operation and maintenance of treatment construction <br /> drainage pattern of controls for the on-site drainage system. Maintenance <br /> the site in a manner <br /> Agreement shall <br /> that could result in Less Than Significant with Mitigation be the <br /> substantial erosion or <br /> responsibility of <br /> siltation on or off site. the HOA <br /> Finger Avenue Nine-1,ot Planned Development Project June 2012 <br /> Mitigation Monitorinb or Reporting Program Page 5 <br /> Page 6 of 21 <br /> RESO.#15445 <br /> MUFF#613 <br />