My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res15 15445
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res15 15445
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:53:32 AM
Creation date
10/11/2019 7:53:23 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/21/2015
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING A PLANNED DEVELOPMENT PERMIT INCLUDING MODIFICATIONS, USE PERMIT, AND VESTING TENTATIVE MAP INCLUDING MODIFICATIONS FOR AN EIGHT LOT RESIDENTIAL SUBDIVISION, PURSUANT TO THE CITY OF REDWOOD CITY ZONING ORDINANCE, THE REDWOOD CITY MUNICIPAL CODE, AND THE SUBDIVISION MAP ACT, AND UPON CONSIDERING ADDENDUM NO. 1 AND ADDENDUM NO. 2 WITH THE FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT EIR, AS CERTIFIED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/21/2015 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT <br /> Timeframe for Responsibility Oversight of <br /> Impact Mitigation [mplementation fO� Implementation <br /> Implementation <br /> CULTURAL RESOURCES Continued <br /> The project may Mitigation Measure CUL-5: If human remains are discovered at During grading The prime Director of <br /> encounter unknown and subsurface construction Planning <br /> human remains the project site during construction,work at the specific construction contractor and <br /> during construction, construction site at which the remains have been uncovered shall anY San Mateo Counry <br /> including those be suspended,and the San Mateo County coroner shall be subcontractor(s) Coroner <br /> interred outside of �mmediately notified.If the remains are determined by the County <br /> formal cemeteries. coroner to be Native American,the Native American Heritage <br /> Commission(NAHC)shall be notified within 24 hours,and the <br /> guidelines of the NAHC shall be adhered to in the treatment and <br /> disposition of the remains. <br /> Less Than Si nificant Im act with Miti ation <br /> It is possible that Mitigation Measure CUL-6: A qualified paleontologist shall be The The project Director of <br /> unknown paleontologist developer,prime Planning <br /> paleontological retained by the project to ensure that any resources encountered shall be identified construction <br /> resouroes could exist during construction are appropriately collected and documented. and approved contractor and <br /> on the site and could prior to issuance any <br /> be damaged during • The project applicant shall identify a qualified of a grading subcontractor(s) <br /> paleontologist prior to any excavation or construction.The ermit <br /> construction of the City shall approve the selected paleontologist prior to p <br /> proposed project. <br /> issuance of the grading permit.The project paleontologist <br /> shall attend the pre-grading meeting to discuss how to <br /> recognize paleontological resources in the soil during <br /> grading activities.The prime construction contractor and <br /> any subcontractor(s)shall be cautioned on the legal and/or <br /> regulatory implications of knowingly destroying <br /> paleontological resources or removing paleontological <br /> resources from the project site. <br /> • If paleontological resources are encountered during the <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page 8 <br /> Page 9 of 21 RESO.#15445 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.