My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res15 15445
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res15 15445
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:53:32 AM
Creation date
10/11/2019 7:53:23 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/21/2015
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING A PLANNED DEVELOPMENT PERMIT INCLUDING MODIFICATIONS, USE PERMIT, AND VESTING TENTATIVE MAP INCLUDING MODIFICATIONS FOR AN EIGHT LOT RESIDENTIAL SUBDIVISION, PURSUANT TO THE CITY OF REDWOOD CITY ZONING ORDINANCE, THE REDWOOD CITY MUNICIPAL CODE, AND THE SUBDIVISION MAP ACT, AND UPON CONSIDERING ADDENDUM NO. 1 AND ADDENDUM NO. 2 WITH THE FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT EIR, AS CERTIFIED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/21/2015 <br /> as a result of work on the site,the project applicant shall <br /> immediately notify the City Arborist of such damage. If, <br /> in the professional opinion of the Arborist,such tree <br /> cannot be preserved in a healthy state,the Arborist shall <br /> require replacement of any tree removed with another tree <br /> or trees in the same general location as the damaged tree. <br /> The number of trees adeyuate to compensate for the loss <br /> of the tree that is removed shall be determined by the <br /> Arborist. <br /> 6. All debris created as a result of any tree removal work <br /> shall be removed by the project applicant fron�the <br /> property within two weeks of debris creation,and such <br /> debris shall be properly disposed of by the applicant in <br /> accordance with all applicable laws,ordinances,and <br /> regulations. <br /> 7. In the event that any of the existing trees do not survive <br /> within five years after the subdivision completion and it is <br /> confirmed by a certified arborist that the trees were <br /> damaged primarily due to construction impacts of the <br /> project,then the homeowners association shall be <br /> responsible to replace the damaged trees to the satisfaction <br /> of the City. <br /> 8. Prior to the commencement of any construction activity on <br /> the project site,the Arborist shall inspect the tree <br /> protection measures required to be in place before the start <br /> of construction to ensure that they have been completely <br /> and properly installed. <br /> 9. The Arborist shall conduct period inspections throughout <br /> the construction on the site to verify that the tree <br /> protection measures outlined in the Tree Protection Plan <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page 13 <br /> Page 14 of 21 <br /> RESO.#15445 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.