My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res15 15445
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res15 15445
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:53:32 AM
Creation date
10/11/2019 7:53:23 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/21/2015
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING A PLANNED DEVELOPMENT PERMIT INCLUDING MODIFICATIONS, USE PERMIT, AND VESTING TENTATIVE MAP INCLUDING MODIFICATIONS FOR AN EIGHT LOT RESIDENTIAL SUBDIVISION, PURSUANT TO THE CITY OF REDWOOD CITY ZONING ORDINANCE, THE REDWOOD CITY MUNICIPAL CODE, AND THE SUBDIVISION MAP ACT, AND UPON CONSIDERING ADDENDUM NO. 1 AND ADDENDUM NO. 2 WITH THE FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT EIR, AS CERTIFIED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/21/2015 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT <br /> Timeframe for Resp f�ibility Oversight of <br /> Impact Mitigation Implementation Implementation <br /> Implementation <br /> AIR QOALITY <br /> The generation ofdust Mitigation Measure AIR-l: The proposed project indudes the During all phases Project applicant City's Building <br /> and other particulate following construction practices to reduce construction dust/air of construction. and contractors Official <br /> �natter could quality impacts to a less than significant level: during all phases <br /> temporarily impact of construction <br /> nearby sensitive <br /> • All exposed surfaces(e.g.parking areas,staging areas, <br /> receptors. soil piles,graded areas,and unpaved access roads)shall <br /> be watered two times per day. <br /> • All haul trucks transporting soil,sand,or other loose <br /> material offsite shall be covered. <br /> • All visible mud or dirt track-out onto adjacent public <br /> roads shall be removed using wet power vacuum street <br /> sweepers at least once per day. The use of dry power <br /> sweeping is prohibited. <br /> • Sweep daily(with water sweepers)all paved access roads, <br /> parking areas and staging areas at construction sites. <br /> • All vehide speeds on unpaved roads shall be limited to 15 <br /> mph. <br /> • All roadways,driveways,and sidewalks to be paved shall <br /> be completed as soon as possible. <br /> • Building pads shall be laid as soon as possible after <br /> grading unless seeding or soil binders are used. <br /> • Idling times shall be minimized either by shutting <br /> equipment off when not in use ar reducing the maximum <br /> idling time to five minutes(as required by the California <br /> airborne toxics control measure Title 13,Section 2485 of <br /> California Code Regulations[CCR]). Clear signage shall <br /> be provided for construction workers at all access points. <br /> ringer Ave�ue Nine-L,ot Planned Development Project .lune 2012 <br /> Mitigation Monitoring or Reporting Program Page 16 <br /> Page 17 of 21 RESO.#15445 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.