My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15554
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:55:50 AM
Creation date
10/11/2019 7:55:46 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/9/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING A MODIFIED DOWNTOWN PLANNED COMMUNITY PERMIT INCLUDING FIVE GUIDELINE DEVIATIONS, A MODIFIED TENTATIVE MAP, A MODIFIED CONDOMINIUM PERMIT, AND A MODIFIED PLANNED DEVELOPMENT PERMIT FOR 603 JEFFERSON AVENUE PURSUANT TO THE CITY OF REDWOOD CITY'S DOWNTOWN PRECISE PLAN, ZONING ORDINANCE, AND SUBDIVISION ORDINANCE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01/09/2017 <br />City that recycled water is available for the property, the applicant shall connect <br />the project to the recycled water system. The project shall provide one "master" <br />recycled water meter for residential dual plumbing and a separate recycled water <br />meter for the commercial/retail space dual plumbing. [SDR][ENGINEERING] <br />38. Dual Plumbing Report - The applicant shall hire an engineer licensed in California <br />and experienced in the field of wastewater treatment to prepare a report pursuant <br />to California Water Code section 13522.5 and in accordance with California Code <br />of Regulations sections 60314 and 60323 (found within Title 22, Division 4, <br />Chapter 3). The report shall be submitted with the first building submittal, and will <br />be routed to the Public Works Department for review and coordination. <br />[COA][ENGINEERING] <br />39. Discharge Permit for Subterranean Garages - If the subterranean garage <br />requires groundwater pumping into the sewer system, a Discharge fee will apply <br />and a Discharge Permit will be required by Silicon Vallev Clean Water (SCVW) <br />prior to issuance of the building permit. If the subterranean garage requires <br />groundwater pumping into the storm drain system, a permit is required from the <br />Regional Water Quality Control Board (RWQCB) in addition to any provisions <br />requested by the City. [SDR][ENGINEERING] <br />40. Backflow Protection — Backflow protection on all water services is required. The <br />backflow preventer shall be above grade and located on private property, <br />accessible to the Public Works division for testing. [COA][ENGINEER] NG] <br />41. Fire Flow - The project shall meet fire flow requirements as established by the Fire <br />Department which are based on the Fire Code. Fire flow tests are typically <br />performed during the preliminary design phase but must be completed prior to <br />submittal of final design. Applicant shall contact the Fire Department for fire flow <br />requirements, and then submit a written fire flow test request to Engineering. <br />[COA][ENGINEERING] <br />42. C3 Requirements - Plans shall be designed to meet C3 requirements of the <br />Municipal Regional Permit (MRP) NPDES Permit CAS612008 and be in <br />compliance with San Mateo County C.3 Stormwater Technical Guidance. <br />[SDR][ENGINEERING] <br />a. Treatment Controls — Treatment measures to be shown on final <br />improvement or grading plans shall not differ materially from the treatment <br />measures presented on the project's Tentative Map, approved on January <br />9, 2017, without written approval from the Engineering Department. <br />b. Treatment Measure Inspection —Applicant shall coordinate installation of <br />stormwater treatment measures with the municipality, shall arrange to have <br />the City's designated inspector present at the time of installation, and shall <br />have the City's designated inspector complete a final inspection of installed <br />stormwater treatment measure immediately after installation is complete. <br />ATTY/RESO.0127/CC RESO APPROVING PERMIT FOR 603 JEFFERSON RE50. NO. 15554 <br />REV: 12-19-16 VR MUFF NO. 603 <br />Page 14 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.