My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15575
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:56:07 AM
Creation date
10/11/2019 7:56:03 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/3/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY DENYING THE APPEAL AND APPROVING A DOWNTOWN PLANNED COMMUNITY PERMIT INCLUDING TWO GUIDELINE DEVIATIONS, TENTATIVE MAP, AND AFFORDABLE HOUSING PLAN FOR 1409 EL CAMINO REAL PURSUANT TO THE CITY OF REDWOOD CITY'S DOWNTOWN PRECISE PLAN, AND SUBDIVISION ORDINANCE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
04/03/2017 <br />shall be obtained prior to the commencement of construction of the road, <br />utilities, or any site improvements. ][ENGINEERING] <br />a. Work in the City public right-of-way, easements or property in which the <br />City holds an interest. <br />b. Work requiring a grading permit. Grading permits require a Plot and <br />Finished Grading Plan prepared by a California -registered Civil <br />Engineer. <br />c. Work requiring on-site shoring which affects the public right-of-way. <br />d. Work using the public right-of-way for any fixed structure (awnings, roof <br />overhangs, fixed planters, etc.). Insurance, meeting the City's <br />standards, is required. This permit will be recorded against the <br />property. <br />26. Undergrounding Utilities - The applicant shall underground all overhead <br />utilities along Diller Street, which shall be shown on the building permit plans. <br />[SDR][ENGINEERING] <br />27. Sewer Capacity — Prior to encroachment permit issuance, submit to the City, and <br />obtain approval of, an evaluation and report prepared by a licensed engineer <br />demonstrating that the existing sewer mains have sufficient capacity for the <br />project. The study shall consider existing, project, other approved projects, <br />and applications currently under review in determining the needed capacity. If <br />the existing sewer main is less than 6" in size, or is in any other way not <br />sufficient as determined by the City Engineer, applicant shall, as part of the <br />Project, construct and install new sewer mains sufficient to meet such <br />requirements, in accordance with the City's Engineering standards and as <br />directed by the City Engineer to the City Engineer's satisfaction. <br />[SDR][ENGINEERING] <br />28. Peak Wet Weather Flow Capacity — The applicant shall reduce inflow and <br />infiltration (1/1), subject to the adopted methodology established by the <br />Engineering Division to offset increased sewer demand from the project by <br />replacing aged sewer mains or pay an equivalent in -lieu fee. The length of pipe <br />replacement required or the amount of fee will be based on the project's sewage <br />generation projection (Attachment L of the City's Engineering Standards). For <br />parcels within Redwood City but connecting to County owned and <br />maintained sewer, an 1/1 in -lieu fee may be collected by Redwood City if the <br />County does not require main replacement or collect and in -lieu fee. <br />[COA][ENGINEERING] <br />29. Sewer Lateral Limit — The project is limited to one sewer lateral. <br />[COA][ENGINEERING] <br />30. Water Mains - Prior to encroachment permit issuance, submit to City, and <br />obtain approval of, an evaluation and report, prepared by a licensed engineer, in <br />conformance with the City's Engineering Standards, demonstrating that the <br />ATTY/RESC.0031/ CC RESO ADOPTING DENIAL OF APPEAL BY REDWOOD CITY RESIDENTS FOR RESPONSIBLE DEVELOPMENT <br />REV: 03-30-17 PR RESO. NO. 15575 <br />MUFF NO. 603 <br />Page 12 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.